Table of Contents
Not every custom-made sign needs a permit, but most permanent ones do. Getting a sign permit is essential. If you install a sign without permission, you may face fines, a removal order, and the cost of taking it down.
The rules are set by your city or county, not by a national authority. That means requirements, fees, and timelines vary depending on where your business is located. Below, you'll find how the process works, which signs are typically exempt, and a state-by-state breakdown of what to expect.
Key Takeaways
- Sign permitting is governed locally, not federally: Your city or county writes the rules, which means the same sign can be approved in one town and rejected in the next;
- One sign often needs more than one permit: An illuminated sign commonly triggers three separate approvals: zoning, building, and electrical. Passing one doesn't mean you've cleared the others;
- Billboards follow a completely different track: Off-premise advertising near interstates and federal highways is regulated by your state's transportation department, on top of local approval;
- Historic districts are usually the longest step: Design review boards meet on fixed schedules, often monthly, and many require approval before your sign permit can even be filed. This is where timelines stretch from weeks into months;
- Who installs your sign can be a permit requirement: Several states and cities will only issue a permit to a licensed sign contractor, and some require a specific sign-installer license beyond a general contractor's;
- Never fabricate before you're approved: Permit rules cover size, height, placement, lighting, and sometimes wording. Building the sign first is the most expensive way to find out it isn't allowed.
Disclaimer: This guide is for general informational purposes only and is not legal advice. The information presented here is correct and verified as of the date of publishing. However, sign regulations, fees, and timelines change frequently and vary by jurisdiction, and we are not responsible for any amendments to state statutes, laws, or regulations that occur after the date of publishing. Always confirm current requirements with your local permitting office and the relevant state agency, and consult a licensed attorney or permit expediter for guidance on your specific project.
What Is A Signage Permit?
A signage permit is an official approval issued by a local city or county through its building, planning, or zoning department. It permits you to legally install, alter, or sometimes even repair a custom sign. This ensures your signs comply with community standards and safety regulations.
Getting a permit is a process that involves a thorough understanding of local laws. It can significantly differ from one jurisdiction to another.
You will likely need a permit if you are installing a new permanent sign, changing the size, structure, or location of an existing sign, or changing its design. A permit may also be needed when you want to add lighting, any digital features, or to put up a long-term banner or temporary sign.
Some cities, towns, or signage types will require additional approvals, such as a zoning board permit to review what you do on that specific land and where a structure sits. You may also need approval from a design review board that evaluates the architectural compatibility of proposed exterior changes to the building.
Why Do You Need A Sign Permit?
You need a sign permit to confirm your sign meets local commercial and administrative rules and regulations. Yes, you can promote your business, but you can’t set up a sign anywhere you want.
Public Safety
State regulations regarding sign permits are meant to promote and preserve public safety. Signs must be securely mounted so they don't fall and injure people.
Aesthetic Standards
Cities often have design guidelines to maintain an appealing visual environment and align it with the area’s character. This is especially common in historical and downtown districts. A sign that’s out of sync with its surroundings can hurt the area's look and feel.
Environmental Impact
Municipalities may also impose regulations regarding certain materials to provide a healthy environment and minimize waste. Illumination standards are also enforced to prevent possible accidents. Signs that are too bright can create unnecessary glare, waste electricity, and blind people.
Fair Competition
Complying with all these guidelines also provides fair competition between businesses. This deters one business from installing an oversized advertising sign against another with a smaller sign.
Which Signs Need a Permit and Which Ones Don't
The types of signs that require a permit may vary depending on where your business is located. Each city, county, or municipal government has its own rules.
Wall-mounted, illuminated, and freestanding signs, such as monument or pole signs, usually require a permit. Window graphics and banners that cover a large portion of the window may also fall into this category. Some cities set time limits on how long printed banners can be displayed and how often they can be used. Many local governments still regulate the use of temporary signs to avoid clutter.
Any sign that lights up, flashes, or uses electronic messaging is almost always subject to strict permit requirements. These regulations ensure that they don’t affect traffic visibility, don’t contribute to light pollution, and have successfully passed electrical inspections.
Even minor changes to your sign in the future may require a new permit. For instance, if you’ve repainted your sign or changed the lighting, your local building department might want to review these changes before you reinstall them.
However, some signs are not subject to these regulations. This group includes interior signs that are not visible from outside. Temporary real estate signs, official traffic signs, yard sale signs, political signs, and emergency or safety signs are exempt too.
Address numbers, directional signs, and official government notices are exempt as well. Flags are also exempt from a permit. Additionally, contractor site identification signs and public event announcements are covered by the exemption.
| Typically Needs a Permit | Typically Exempt |
|---|---|
| Wall-mounted signs | Interior signs not visible from outside |
| Illuminated signs | Temporary real estate signs |
| Freestanding signs (monument or pole) | Official traffic signs |
| Large window graphics | Yard sale signs |
| Large banners, with limits on duration and frequency | Political signs |
| General temporary or promotional signage | Emergency or safety signs |
| Flashing or electronic message signs | Address numbers and directional signs |
| Signs modified with new paint or lighting | Official government notices |
| Flags | |
| Contractor site identification signs | |
| Public event announcement signs |
Who Issues Sign Permits in the US?
Local municipal authorities through city or county departments issue sign permits in the US. These public institutions include the Zoning Department, the Department of Buildings, or Planning and Development Services, which ensure signs comply with local rules. Your illuminated or electrical signs may also need separate approval from the electrical bureau or public works.
Four Types of Approval a Sign Project Can Trigger
Sign projects in different cities or counties may require different types of approvals. Here are four of the most common ones:
Zoning and Planning Review
A zoning and planning review is an official evaluation by a local government to ensure that a proposed building or land-use project complies with local laws and codes.
It determines the sign's height and width based on the location. It controls how close a sign can be to the street, property lines, or other buildings. During this review, the types and quantity of signs are also determined. The zoning and planning review ensures signs use resilient materials and meet local wind loads.
Building and Structural Permit
This is an official approval issued by the local government that allows you to construct, alter, or install a physical structure safely. It proves your sign can handle wind or rain. It also covers wiring, lighting, and power connections in case you want to install illuminated signs.
The building and structural permit also ensures the sign safely anchors to a building wall. If it’s a freestanding sign, it proves the sign is securely installed in the ground.
Electrical Permit
An electrical permit is an official document issued by a local authority that authorizes you to perform electrical work.
For signs, it covers how the sign connects to the main building power and checks for internal wiring. It also entails the inspection of new wires, junction boxes, or new switches.
Sign-Code Variance
This is an official exception granted by the authorities that exempts your sign project from zoning ordinances.
You can obtain a variance for visibility issues. The applicants must prove the area’s topography is unusual or there is a sharp curve in the road. It’s also issued in cases when the sign design requires a larger square footage or greater height than local rules permit.
A sign can get a variance based on placement restrictions, such as setbacks or property lines forcing a specific location that conflicts with standard code distances. Extra signs, required for property wayfinding or complex property layouts, may also qualify for a variance.
Local boards, such as a Board of Adjustment or Planning Commission, grant this approval. To be eligible for variance approval, you need to prove that the problem stems from the land’s specific shape, location, or grade. That shouldn’t be the owner's problem. You, as an applicant, should verify that the modified signs won’t block driver visibility or endanger pedestrians.
State-by-State Signage Regulations
Sign rules change often and vary widely between cities, counties, and states. Everything below is general information about how permitting usually works. It isn't legal advice, and it isn't a substitute for checking with the office that issues your permit. Facts were accurate at the time of publishing. Always confirm current requirements with your local building, planning, or zoning department before you order or install a sign.
Click on a state below to reveal its section right under the table.
| In Alabama, almost every standard business sign permit is issued by a local municipal government (cities or towns). Permits for roadside billboards near Interstate, primary, or NHS highways are issued by the Alabama Department of Transportation (ALDOT) Outdoor Advertising Program. This is a state layer sitting above a local code. Another state layer is the statewide 2021 International Building Code, which sets the standards for structural and wind design. |
|
What Makes Alabama Specific
The ALDOT enforces a clear state fee under Code of Alabama 23-1-275: a $25 permit fee per location and a $10 annual renewal fee. Every approved structure should carry a physical identification tag affixed to the sign. Fees are due January 1 and delinquent after February 15, with a 25 percent penalty.
Some Gulf Coast counties in Alabama are located in high-wind areas. These counties include Mobile and Baldwin, which are in a high-wind zone under the 2021 IBC statewide. This means coastal sign structures demand extra engineering that landlocked signs in Alabama don’t.
There are seven historic districts in Mobile. The Architectural Review Board must issue a Certificate of Appropriateness before granting any building permit in this area. Birmingham requires sign erectors to hold a sign-erector’s license from the building official.
Statewide Rules
ALDOT outdoor advertising (Code of Alabama 23-1-275) requires a separate permit for off-premise billboards near Interstate, primary, or NHS highways. It should contain an identification tag affixed to the structure, in addition to the local permit. On-premise signs are generally exempt from the program.
The 2021 Statewide IBC is enforced in Alabama for structural and wind design. Direct state building code inspection is limited to specific building types. Local jurisdiction inspects most commercial sign structures. The wind-load design matters most on the Gulf Coast, which encompasses Mobile and Baldwin counties.
The Typical Permit Process
- Determine the jurisdiction and the zoning district. If there are some exemptions regarding size, height, and setback, they’re all set locally.
- Find out whether the sign you’re going to install requires a permit.
- Fill in a sign permit application form and submit it to the city building/inspections department. The form must contain a site plan, drawings, dimensions, mounting and structural details, and Underwriters Laboratories (UL)-listed components for light-up signs.
- Use a licensed sign erector if required. For example, Birmingham requires this license.
- Obtain a Certificate of Appropriateness before getting the building permit if your property is situated in a historic or design overlay.
- Get a separate ALDOT permit for off-premise highway billboards. Pay the state fee and get the identification tag.
- Pass any inspection and renew the ALDOT permit annually.
Notable Jurisdictions
Montgomery is the state capital, where sign permits are issued through the city Inspections Department. It publishes target plan review windows of about 5 working days for residential and 10 for commercial. Tall pole signs require a stamped plan.
Birmingham is the largest metropolitan area, and its sign regulations are in the zoning ordinance, Appendix D, and a dedicated sign ordinance. A sign-erector’s license is required from the building official for sign erectors. Another electrical license is required for illuminated signs. Applications run through Planning, Engineering, and Permits.
Mobile is a Gulf Coast port city. The signs in this area are governed by Chapter 54 plus the zoning ordinance. Two extra layers sit above the local law. The first one is the coastal high-wind structural design under local IBC amendments. The second is the Architectural Review Board, which must issue a Certificate of Appropriateness before any building permit in seven historic districts.
Huntsville is a fast-growing North Alabama metro. The sign rules are in Article 72 of the zoning ordinance. The Zoning Administration issues sign permits. You can check and confirm the current online application status with the Zoning Office.
Phenix City is a smaller city in eastern Alabama. It includes common requirements such as UL approval numbers for illuminated signs, which should be handled through the building department’s commercial permit process.
Timelines
Jurisdictions set the timelines. On-premise permits in smaller cities can be approved the same day or last a few days. There is a plan-review queue in larger cities. In Montgomery, for example, targets are published in about five working days for residential plans and 10 working days for commercial plans. On the state side, ALDOT is required by statute to act on an outdoor advertising application within 90 days of submission; confirm current processing practice with the department.
Sources Used
| Alaska has banned billboards and roadside advertising since 1949 by a territorial law. This law was locked in by voters in 1998 via Ballot Measure 5 with the slogan Alaska shall forever remain free of billboards. One can encounter only on-premise commercial signage. It must relate to the business on the same property. |
|
What Makes Alaska Different
Off-premise outdoor advertising is unavailable statewide, as voters affirmed a total ban on billboards in 1998. There are vast unincorporated and unzoned areas in the state, so land-use geography is unusual. So when it comes to installing signage, the essential question is whether there is an authority that issues permits.
There are two regimes in Alaska. The State DOT&PF right-of-way rules mean that even if a sign complies with local zoning, it can still be illegal if it intrudes on or is improperly visible from the state right-of-way. The second regime is the local municipal or borough zoning code where one exists.
Statewide Rules
Billboard or off-premise advertising is prohibited. The Alaska DOT&PF enforces the outdoor-advertising statutes (AS 19.25.075-.180). Under AS 19.25.105, outdoor advertising can't be placed within 660 feet of the right-of-way where it's visible from the road, and it can't sit beyond 660 feet either if the message is meant to be read from the road.
The Typical Permit Process
- Plan on-premise signage, as off-premise or billboard signs are prohibited in this state.
- Find out the governing jurisdictions. Determine whether the site where you want to place a sign is an incorporated city or an unzoned area to check whether a sign permit can be applied for at all.
- Anchorage requires a zoning or sign permit under Title 21 (AMC 21.12) for most signs. The sign can only advertise business or activities located on the same property. Portable and A-frame signs are not allowed municipality-wide. Restrictions are applied to the new pole signs.
- Juneau requires a Sign Permit and Development Permit (CBJ 49.45) for most business signs. Additional standards apply to downtown Historic District signs. City and Borough of Juneau processes complete applications within about three working days.
- Freestanding or illuminated signs may require separate building, structural, and electrical permits.
Notable Jurisdictions
Municipality of Anchorage is the largest jurisdiction in Alaska. The signs are governed by Title 21 (AMC 21.12). The signs are on-premise only. Portable A-frame signs are prohibited municipality-wide, and new pole signs are restricted.
City and Borough of Juneau is the state capital. The sign standards are set in CBJ 49.45. Business signs need both a Sign Permit and a Development Permit. According to CBJ, it processes complete applications in three working days. The downtown Historic District imposes additional sign standards.
Fairbanks North Star Borough has unzoned areas, so the sign rules apply only within established zoning districts. The sign permits in this borough are issued through its Building Department.
Matanuska-Susitna Borough is a fast-growing region that is not comprehensively zoned. MSB Permit Center in Palmer issues permits. Incorporated cities, such as Wasilla and Palmer, have their own zoning and sign codes.
Timelines
Timelines vary by jurisdiction. They are not standardized statewide. Sign applications are processed in Juneau within three working days. There are no statements on timelines in other jurisdictions. Simple on-premise signs in zoned commercial areas can obtain permits in short timelines. Signs that require building or electrical permits, a Juneau historic-district review, or are subject to variances may take longer.
Sources
| In Arizona, sign permitting is issued by the city or county through local zoning. A separate ADOT state permit is required for off-premise billboards. A local permit is required before fabrication for nearly every permanent business sign. Some Arizona cities require a licensed contractor to install the sign. Some Arizona communities limit sign lighting under dark-sky ordinances, restricting how bright illuminated signs can be. |
|
What Makes Arizona Different
There is a dark-sky culture in Arizona that limits sign lighting. Flagstaff was the first city in the world to earn “International Dark Sky City” certification. This means the city has strict laws protecting its night sky from artificial light. Sedona has similar rules. This isn’t about signs specifically but light in general.
Both cities require shielding for light fixtures so that light points down toward the ground rather than up into the sky. They also require full cutoff, another form of shielding. Essentially zero light is allowed to escape above the horizontal line. The other requirement is having lumen caps, which is a hard limit on how bright a sign's lighting can be.
Statewide Rules
ADOT billboard permits (off-premise)
If a billboard is visible from certain state highways, Arizona's own transportation department, ADOT (Arizona Department of Transportation), has to sign off on it too. This is completely separate from whatever your city already approved. ADOT caps the size of that billboard (up to 1,200 square feet per face). The fees are modest, with a $20 application fee.
Dark-sky lighting codes
You'll need to think beyond the usual sign rules if you’re planning illuminated signs for Flagstaff or Sedona. Both cities protect their night skies with strict lighting codes. Signs fall under those rules too. Fixtures have to be shielded, pointing light down. There's also a hard cap on total brightness, which makes bright cabinet signs, glowing lightboxes, and digital displays a tough fit here.
The Typical Permit Process
- Identify which jurisdiction governs your property, along with its zoning.
- Check whether your signage is subject to extra layers. A Master Sign Program applies to shopping centers, office parks, or planned developments. The entire property must follow a single pre-approved plan. So your sign has to match a design the property already agreed to. Historic-district rules, like Tucson’s, are applied if your property sits in a designated historic area. These rules protect the neighborhood’s look. They can restrict sign size, materials, or lighting.
- You’ll need a scaled site plan and sign drawings that show dimensions, materials, and lighting details. Most freestanding or electrical signs also require engineered drawings.
- Submit your application through your jurisdiction’s system. Turn to Phoenix's Development Center, Scottsdale's SPUR, Tucson's PDSD, or Mesa's Development Services, depending on where your building is located.
- An Arizona-licensed sign or general contractor needs to pull the permit and handle installation. Some cities, including Scottsdale, require this.
- If it's an off-premise billboard, you'll also need a separate ADOT Outdoor Advertising permit.
- Once the sign is up, schedule the required inspection to close out the permit.
Notable Jurisdictions
Phoenix is the largest city in Arizona. The Zoning Ordinance Section 705 governs the on-premise signs. Nearly all permanent signs need a permit from the Planning & Development Department. One or two signs can sometimes be approved on the spot. Anything more complex goes through a full plan review instead.
Tucson - Sign rules in Tucson are set forth in the Unified Development Code, Article 7A. The illuminated signs are under the city’s Outdoor Lighting Code. No allowance for animated and flashing signs. Historic districts require added review for the signs.
Scottsdale - This is one of Arizona’s strictest regimes regarding design-driven signs (Zoning Ordinance Article VIII). The city’s online permitting portal, Scottsdale Permits, Utilities & Records (SPUR), grants the permits. Signs must be set up by an Arizona-licensed general contractor or sign contractor.
Mesa is the third-largest city in Arizona. Sign rules fall under Title 11 of the City Code, and Development Services handles the review. A paid expedited option is available if you need a faster turnaround. Electronic message centers face additional limits on brightness, animation, and the duration each message can be displayed.
On Timelines
Timelines may vary from city to city. Phoenix issues wall-sign permits over the counter for one or two signs at staff discretion. In Scottsdale, staff dedicates only five business days for review. Freestanding or electrical signs need extra scrutiny.
Sources
| In Arkansas, your city or county handles sign permits through local zoning. There are two state-level systems sitting on top of that. ARDOT's Beautification Section permits billboards along interstates and major highways. A statewide fire code also sets the structural and electrical rules, no matter where your building is. Some cities also require historic-district review. |
|
What Makes Arkansas Different
Arkansas has unusually concentrated control over historic-district signage. Eureka Springs' entire downtown is a National Historic District. This means almost every sign there needs formal design approval. Hot Springs has two of its own historic districts, plus a stretch of federal National Park land running right through downtown.
Little Rock has a special zoning district built entirely around the State Capitol and Governor's Mansion, run by its own commission separate from the city. Under the resulting state regulation, Little Rock cannot legally issue a sign permit for any property within the district until the Capitol Zoning District Commission approves it. However, you must also get a regular sign permit.
And if you want to put up a billboard along an interstate or major highway, ARDOT's Beautification Section has to sign off.
Statewide Rules
Arkansas Fire Prevention Code (structural and electrical)
No matter which city your building is in, your sign's structure must comply with the Arkansas Fire Prevention Code. This Code is the state's own version of the International Building Code. It sets the wind, seismic, and structural-load standards for every sign.
If your sign is illuminated, that triggers a separate electrical permit at the local level too. If you're building in northeast Arkansas, near the New Madrid Seismic Zone, your sign's structural design may need to account for earthquake risk.
ARDOT Beautification Section (billboards)
Billboards visible from an interstate or federal-aid primary highway need their own state permit, separate from whatever your city already approved. This comes from a mix of the federal Highway Beautification Act and Arkansas's own 1967 law. The rule kicks in within 660 feet of the highway.
The Typical Permit Process
- Start with your city or county. Apply through the local planning, development, or building department for your standard sign. This excludes areas that have their own dedicated forms, like Little Rock.
- Check whether you actually need a permit. Most cities require one for anything new, replaced, or modified. Bentonville, for example, requires a permit for nearly any change to a sign.
- Look for exemptions. Every city's list is different. Fayetteville, for instance, exempts a few sign types, but even those still get checked for size and placement.
- If your sign involves structural or electrical work, it must comply with the statewide fire code. Illuminated signs need their own local electrical permit.
- If your property is in a historic district, you'll need design approval, which is called a Certificate of Appropriateness. This is applied in both Hot Springs and Eureka Springs.
- If your property sits inside Little Rock's Capitol Zoning District, you'll need a separate Capitol Zoning permit in addition to the standard one.
- A separate application is required for a billboard along a controlled highway and must be filed directly with ARDOT's Beautification Section.
Notable Jurisdictions
Little Rock is the state's largest city. It handles on-premise signs through Planning & Development, using its own dedicated application. The Capitol Zoning District is a state-created overlay district in which any sign near the Capitol or the Governor's Mansion requires additional approval.
Fayetteville doesn't require a permit for every sign. Construction, real estate, and home-occupation signs are exempt, for example. But even exempt signs still get checked for size and placement. Properties downtown or along I-540 face additional design rules due to local overlays.
Bentonville is one of Arkansas's fastest-growing cities. It takes a stricter approach: almost any sign change requires a permit, which must be filed through their online eTrakit system.
Hot Springs has two separate historic districts. Each of them requires design approval before your standard sign permit can be issued. If you're near Bathhouse Row, that stretch is actually federal National Park land, not city property.
Eureka Springs might be the most design-restrictive sign environment in Arkansas. The entire downtown here is a National Historic District. Nearly every sign needs a Certificate of Appropriateness.
On Timelines
Timelines depend on your sign and your city. A standard sign might be approved over the counter or within a couple of weeks. But if you need a variance, or your project goes before a planning commission, it might take weeks or months.
Sources
| There's no single, statewide sign permit in California. Every city and county runs its own process. On top of that, two statewide rules are applied almost everywhere. The first one is the energy code for illuminated signs. The second is the coastal zone rule, which may require a separate permit if you're near the water. There's also a third layer if you're putting up a billboard. Caltrans regulates outdoor advertising visible from state highways, separately from your city. |
|
What Makes California Different
California applies a statewide energy code to signs. If your sign lights up, it falls under Title 24, which is the state's energy code. It limits how much power the lighting can draw. It requires automatic shutoff or dimming at night, usually via a timer or a light sensor. You'll need to document that compliance on an official state form.
If your property sits in California's coastal zone, your sign might need a completely separate approval called a Coastal Development Permit, alongside your regular city permit. This is to protect ocean views and scenic areas.
Big cities add their own complexity, too. In Los Angeles and San Francisco, two separate departments (planning and building) must sign off. Digital or off-site advertising signs are only allowed in specific designated districts.
Statewide Rules
The energy code (Title 24) for illuminated signs
Any lit-up or electric sign in California must comply with the state's energy rules, regardless of the city. The code caps how much power the lighting can draw and requires it to automatically dim or shut off at certain hours.
You'll need to fill out a specific state form (called an NRCC-LTS) proving your sign complies with state requirements. Always have it ready when your permit gets inspected. These numbers can update between code cycles. It's worth double-checking the current requirements with the state before finalizing your design.
The Coastal Act if you're near the coast
If your property is in the coastal zone, a sign might need a Coastal Development Permit in addition to your normal city permit. The Coastal Commission can restrict what kind of sign you install, how big it is, and how it's lit to protect ocean views.
Caltrans outdoor advertising
If your billboard sits within 660 feet of a state highway right-of-way and is visible from the road, you need a permit from Caltrans on top of your local one. This comes from the California Outdoor Advertising Act, in the Business and Professions Code.
Caltrans sets hard limits on size and placement. A display can't exceed 25 feet in height or 60 feet in length, and can't exceed 1,200 square feet in total. On freeways outside incorporated cities and urban areas, the display must also be at least 500 feet from an interchange, at-grade intersection, or roadside rest area. Electronic message displays face an extra rule: they must be at least 1,000 feet from another electronic display.
There's one more requirement people miss. Running an outdoor advertising business in California requires a separate state license, not just a per-sign permit.
The Typical Permit Process
- Find your city or county's specific sign code, as it varies by jurisdiction.
- You'll need a site plan showing where the sign goes, a drawing showing its size and design, and details on how it'll be mounted. Bigger or freestanding signs usually need engineering calculations from a licensed engineer.
- Submit it, along with your fees. Most California cities want this done online now, and they'll bounce back anything that's missing pieces.
- The city checks your sign against local rules. If it lights up, they'll check it against the state energy code too.
- If you're in a historic district, a coastal zone, or downtown, expect an added layer of design review.
- If your sign is illuminated, you'll need a separate electrical permit too. Once everything's installed, you'll need a final inspection to close it out.
- If it's a billboard visible from a state highway, file separately with Caltrans. You'll need their permit in addition to everything your city requires.
Notable Jurisdictions
In Los Angeles, the Building and Safety Department issues the sign permits. Big digital displays and off-site advertising signs are banned almost everywhere in the city, with some exceptions.
In San Francisco, two departments review your sign here: Planning and Building Inspection. Because two teams must sign off separately, even a simple sign can take several weeks.
In San Diego, roof signs aren't allowed anywhere in the coastal zone. If your sign is a ground or monument sign over seven feet tall, you'll need a full building permit too.
In Sacramento, applications go to the city's chief building official. You’ll need to provide drawings showing exactly where the sign goes, how big it is, and how it's built. For bigger signs, they may ask for engineered documentation.
West Hollywood has a "creative sign" track for more artistic or unusual signage, which includes additional design review. Smaller signs (under 50 sq ft) get reviewed by staff. Bigger ones go in front of the Planning Commission itself.
On Timelines
The timeline of getting a sign permit in this state depends entirely on the city and your sign. You might get a permit for a wall sign in a few weeks. But if two departments have to review it, it might take several months instead.
Sources
- California Energy Commission - nonresidential sign lighting standards
- California Sign Association - CEC sign-lighting compliance forms
- Los Angeles Municipal Code, Article 4.4 (signs)
- San Diego Municipal Code, Ch. 14 Art. 2 Div. 12
- San Diego Development Services - sign permit information bulletin (DS-111)
- Sacramento City Code, Ch. 15.148 (signs)
- California Coastal Commission - Coastal Development Permit forms
- Caltrans - coastal scenic resources policy
| The sign permit rules vary by city or county. You'll usually need a zoning permit and building permit for a sign on private property. For an illuminated sign, you’ll need a separate electrical permit. Paid signs near state highways need a permit from the Colorado Department of Transportation (CDOT). |
|
What Makes Colorado Different
Colorado doesn't have one rulebook for signs. Every city makes its own rules. A busy street with lots of shops follows different rules than an old, historic part of Boulder. And Aspen, the resort town, has its own rules too.
That means the same sign could get a permit in one afternoon in one city. But it may take months to get approved in another.
Aspen, for example, is the slowest one. Their schedule gets booked months in advance, so plan yours with that in mind.
Getting a lit-up sign in Denver may need three separate permits. The first is for zoning, the second for building, and the third for electrical work.
Statewide Rules
CDOT and outdoor advertising
Billboards used to follow one simple rule. If the sign was for the business it stood in front of, it didn't need a special state permit. If it was for something else, like an ad for a totally different company, it did.
In 2021, Colorado changed that rule. Now it doesn't matter what the sign is for. The only question is: did someone pay money to put that ad up? If yes, it needs a state permit. If no, it doesn't.
The Typical Permit Process
- Figure out your zoning district. That tells you what sign types, sizes, and lighting are even allowed at your address.
- Next, put together a site plan and sign drawings, then submit them to your city's development review office.
- If your sign needs a building permit, get that sorted too.
- If it's illuminated or wired in any way, you'll need a separate electrical permit.
- If your property sits in a historic district, you'll need design approval before your sign permit moves forward. Denver calls this a Certificate of Appropriateness. Boulder calls it a Landmark Alteration Certificate.
- If your sign reaches into the public right-of-way, you'll need a separate permit from the transportation department too.
Notable Jurisdictions
Denver issues sign permits through its Zoning Code, and most private-property signs receive a same-day in-person review. You'll still need separate building and electrical permits where they apply. Signs extending into the right-of-way require a permit from Denver's Department of Transportation and Infrastructure.
Historic district signs need that Certificate of Appropriateness from Landmark Preservation. In Denver, certain temporary signs can go up for 45 days without a permit.
Colorado Springs handles signs under its Unified Development Code. You'll need sign plan approval and a sign permit. If a building permit applies to your project, your sign permit won't be issued until the building permit is issued first. Everything runs through the city's online Development Review Enterprise portal.
Boulder's sign code (B.R.C. 9-9-21) includes a long list of exemptions to consider before assuming you need a permit. If your property sits in a Landmark or Historic Preservation District, you'll need a Landmark Alteration Certificate. Signs that cross into the right-of-way require their own revocable permit. Downtown properties face extra right-of-way lease requirements too.
Aspen treats almost any sign installation or alteration as requiring design review. The Historic Preservation Commission books up months in advance, so start early.
Fort Collins isn't a huge city, but it still sets its own sign rules rather than following a state standard. That's true almost everywhere in Colorado, no matter the city's size.
On Timelines
The time period depends on the city and the sign. Denver often reviews a simple zoning submission the same day. But if you also need a building permit, electrical work, a historic district review, or right-of-way involvement, you'll often have to wait several weeks.
Aspen is its own case entirely. With the Historic Preservation Commission booked out months in advance, that alone can be the longest part of your timeline.
Sources
| Connecticut is renowned for its extreme localism. It has 169 towns and cities, each with its own zoning rules under a law called CGS § 8-2. |
|
What Makes Connecticut Different
If your sign is for your own business on your own property, your town handles it. The Department of Transportation (ConnDOT) issues permits for billboards and signs visible from interstate highways.
Not every electrician can install illuminated or electrical signs. You, as an installer, must have a state license, beyond a simple electrician’s license. You should contact the state's Department of Consumer Protection to obtain the license.
For installing signs in historic areas, there’s an extra step you should take. A commission has to approve your sign’s design first. This approval is called a Certificate of Appropriateness. They have 65 days to make a decision. If they don’t act in the given timeframe, your sign is automatically considered approved.
Statewide Rules
The ConnDOT state sign permit
If you're putting up a billboard or any sign visible from an interstate or another major highway, you need a permit from the state under CGS § 13a-123. You will also need your local town’s approval.
There are also separate rules about sign placement. You cannot put an advertising sign within 100 feet of a public park, state forest, a playground, or a cemetery. Billboards can only go up within 660 feet of certain highways in areas zoned for commercial or industrial purposes.
The C-7 / C-8 electric sign license
The person installing a light-up sign should have a C-7 or C-8 license, which the state Department of Consumer Protection issues. A C-7 (Limited Electrical Sign Contractor) or C-8 (Journeyperson) under Conn. Agencies Regs. § 20-332-2. Some cities (Bridgeport) also require a separate municipal sign license plus proof of the state C-7/C-8.
The Typical Permit Process
- Figure out which track applies to you. If you want to install a regular business sign, then your town handles it. A billboard, for example, also needs the ConnDOT permit.
- For the local permit, bring an application, a site plan, and drawings showing your sign's size to your town's zoning or building department.
- If you're in a historic district, get your Certificate of Appropriateness first.
- For the ConnDOT permit, apply through ConnDOT's Office of Rights-of-Way.
- Make sure your installer has a C-7 or C-8 license if your sign is electric or illuminated.
Notable Jurisdictions
Hartford maintains its sign rules in Chapter 8 of its zoning code, with permits issued by the city's Department of Development Services. Hartford also hosts several of the state's digital billboards, including Connecticut's very first one.
Stamford’s Zoning Enforcement Officer must approve or deny a sign permit within 10 business days of a complete application, or the sign is treated as not needing a permit, as long as it still follows the actual rules.
New Haven shows how a town can choke off billboards without banning them outright. By raising the required spacing between billboards from 500 feet to 1,500 feet, the city made it almost impossible to find a legal spot for a new one.
Bridgeport asks for more paperwork than most towns. You'll need a City of Bridgeport Sign License. If your sign is electric or lit up, you'll need a state C-7 or C-8 license too. Permits go through the Building Department.
On Timelines
Requirements vary from town to town. The paperwork and permitting process takes a short time in some towns, like Stamford. Other towns send larger or illuminated signs to a full commission hearing. This prolongs the process.
Sources
| Land use and sign permitting in unincorporated areas are handled by three county governments (New Castle, Kent, and Sussex). County issues sign permits for most commercial sites. Delaware adds a mandatory state layer. Delaware Department of Transportation (DelDOT) governs all signs over 32 square feet under the state's outdoor advertising program. A DelDOT sign-off is required before a county will grant a permit for larger ground or pole signs. |
|
What Makes Delaware Different
Counties are essentially the default permit authority of unincorporated areas. Towns issue the permit for incorporated areas. There are three counties in Delaware that issue sign permits. Delaware doesn’t prohibit billboards. Off-premise signs are legal but are under strict restrictions. New Castle County limits them to commercial or manufacturing districts.
Sussex County requires a Board of Adjustment special-use exception and a DelDOT “letter of no objection” for installing the sign on key highways. Dover prohibits billboards and off-premise signs outright within city limits.
Statewide Rules
DelDOT outdoor advertising (17 Del. C. Ch. 11)
Any sign over 32 square feet requires a mandatory state Outdoor Advertising review in addition to your local permit. You need a DelDOT letter of approval before a county will approve a large ground or pole sign. Delaware doesn't ban billboards outright, but off-premise signs face tight restrictions, and DelDOT's involvement applies regardless of which county or town issues the local permit.
The Typical Permit Process
- Incorporated towns and cities issue their own permits for installing signs. Unincorporated areas fall to one of the three counties, New Castle, Kent, or Sussex.
- If your sign is bigger than 32 square feet, plan on state involvement. Get a DelDOT approval letter for larger ground or pole signs.
- If you're installing anything electronic or digital, expect extra paperwork.
- Once you've paid your fees and gotten your permit, you can install your sign.
Notable Jurisdictions
New Castle County is the primary permitting authority for the populated northern area. Any ground or pole sign 32 square feet or larger needs that DelDOT Letter of Approval first. Off-premise signs are only allowed in commercial and manufacturing districts. Signs over 150 square feet or over 25 feet tall require a sealed design from an engineer.
Wilmington is the state's largest city. The Department of Land Use and Planning issues its own permits with sign rules in the city code of Chapter 41. Residential areas are limited to small, window decals and plaques.
Dover, the state capital (Kent County), handles permits through its Planning and Inspections office. This is the strictest jurisdiction in the state for off-premise advertising. Billboards, off-premise signs, and roof signs are all prohibited outright within city limits. Even electronic message signs face real limits prohibiting any movement on the sign.
Sussex County, Delaware's beach and resort region, allows billboards, but only in commercial zones and only with a special-use exception from its Board of Adjustment. Signs along Routes 1, 13, 113, and 9 also need a letter of no objection from DelDOT.
Rehoboth Beach, a small, densely populated beach town, handles its own sign review through the Building and Licensing Department. The town uses a table of requirements based on zoning district, and applicants need mock-ups, photos, and a signed sign contract before getting a sign sticker.
On Timelines
If you want to install a small on-premises wall or monument sign under 32 square feet and have provided complete paperwork, expect to receive permits within a few days to a few weeks.
Signs over 32 square feet require a state DelDOT review, which adds time. Off-premise signs and billboards take the longest.
Sources
| Florida usually requires two permits for signs. They are a local zoning and sign-code review, plus a building permit under the statewide Florida Building Code. This imposes hurricane wind-load engineering on most permanent signs. |
|
What Makes Florida Different
Florida requires a layer of hurricane engineering on top of regular zoning review. The statewide Florida Building Code, the 2023 8th Edition, adopted a newer, stricter wind standard called ASCE 7-22. In practice, that means most permanent commercial signs need signed and sealed structural drawings.
Miami-Dade and Broward are in the High-Velocity Hurricane Zone. If you're putting up a sign in this zone, the parts and attachments generally need a Miami-Dade Notice of Acceptance, or a Florida Product Approval with a special HVHZ endorsement.
If your sign sits within 660 feet of an interstate, a federal highway, or a state highway, you might need a separate state permit from Florida's Department of Transportation, on top of your regular local one. This comes from a state law, Florida Statutes Chapter 479.
Statewide Rules
Wind loads under the Florida Building Code
Permanent signs need engineering for hurricane wind loads under the state's building code, which follows the ASCE 7-22 wind maps. Most freestanding signs and signs mounted to a building need real structural drawings, signed and sealed by a licensed engineer.
The High-Velocity Hurricane Zone
In Miami-Dade and Broward Counties, sign parts and attachments generally require a Miami-Dade Notice of Acceptance or a Florida Product Approval with the HVHZ endorsement.
The Typical Permit Process
- Check your local zoning and sign code first. You'll want to confirm your sign's size, height, and lighting. Many cities also want written permission from the property owner if you're a tenant applying on their behalf.
- You'll typically need a site plan showing exact distances to your property lines, elevation drawings, sign area calculations, a wind load report, and details on how the sign attaches to the ground or building.
- If you're in the Miami-Dade or Broward HVHZ, make sure your products actually carry the Notice of Acceptance or HVHZ-endorsed approval.
- Submit your sign permit, and if it's illuminated, pull a separate electrical permit too.
Notable Jurisdictions
Miami runs its signs through the Miami 21 zoning code. Because Miami sits in Miami-Dade County, it falls inside the HVHZ, so structural and product requirements here are the toughest anywhere in the state.
Jacksonville handles sign permits through its Building Inspection Division. If your sign is bigger than 32 square feet, taller than 8 feet, or illuminated, you'll need a $5,000 sign bond before they'll issue your permit. Illuminated signs also require a separate electrical permit.
Tampa processes commercial sign permits through its Construction Services department. They want a site plan with exact property line distances, elevations, a wind load report, electrical details, and foundation plans.
Orlando runs permits through its Permitting and Inspections office, using a published checklist for sign plan review.
On Timelines
Jacksonville offers a first-come walk-through review on certain days. Other cities run a multi-week plan check. Delays most often come from the HVHZ product approval step, or from engineering revisions sent back for correction.
Sources
- Florida Building Commission - ASCE 7-22 wind loads fact sheet
- City of Miami - sign code design standards
- City of Jacksonville - sign laws
- City of Tampa - sign permits
- City of Fort Lauderdale - sign regulations (ULDC 47-22)
- FDOT - outdoor advertising FAQ
- Florida Statutes Chapter 479 - outdoor advertising
| In Georgia, each city or county issues permits for on-premise commercial signs. Requirements and timelines vary from jurisdiction to jurisdiction. The Georgia Department of Transportation (GDOT) grants permits for billboards. |
|
What Makes Georgia Different
Several of its biggest metro areas, Augusta, Macon, and Columbus, are consolidated city-county governments. That means one office and one ordinance covers the whole metro area, instead of the city and the county running separate systems.
Savannah, Macon, and Augusta all run active historic review boards. Getting your sign approved there often takes longer than anything else in the process. They require a Certificate of Appropriateness for storefront signage, which is often the longest step in the schedule.
The state gives permits for installing billboards, rather than your city or county, under a rule called the Georgia Outdoor Advertising Control Act. Since September 15, 2025, submissions have been accepted only through the Georgia Department of Transportation (GDOT) website.
Statewide Rules
GDOT billboard permits
Billboards and other off-premise advertising signs within 660 feet of a controlled highway are regulated by the state, under a law called the Georgia Outdoor Advertising Control Act. To install regular on-premise business signs, you can get permits from your local city or county.
The Typical Permit Process
- Determine your sign type. Most ground, wall, and illuminated signs require a local permit. Many jurisdictions exempt small temporary or window signs.
- Apply to your local planning, zoning, or building office. You'll need to show the location, dimensions, setbacks, and lighting details.
- If it's illuminated, you'll need to provide electrical and UL information and pull a separate electrical permit. Freestanding or projecting signs also need a structural review to get the installation permit.
- Get the Certificate of Appropriateness from the local historic board to install signs in historic areas, alongside your sign permit.
- Obtain right-of-way authorization for signs that project over a public sidewalk or street, plus liability insurance.
Notable Jurisdictions
Atlanta is Georgia's largest metropolitan area, governed by the Sign Ordinance (Part 16, Ch. 28A). The rules determine how many signs you can install, how big and how tall they can be, based on your zoning district. Atlanta's ordinance requires a permit decision within 30 days of submission. Illuminated signs need electrical and UL details, and if your sign projects over the right-of-way, you'll need liability insurance, specifically $1,000,000 per occurrence.
Savannah has one of the strongest historic-preservation systems in the state. Signs in the Downtown Historic District and other overlay areas need a Certificate of Appropriateness review from a historic board. It’s coordinated through the Metropolitan Planning Commission. The city's Zoning Ordinance regulates general sign rules.
Augusta-Richmond County, a consolidated government, regulates signs through its Comprehensive Zoning Ordinance. Signs face tighter area limits in planned-development zones and in National Register or local historic districts. Permitting is provided by Planning and Development, with the Fire Marshal's involvement.
Macon-Bibb County governs signs under its Comprehensive Land Development Resolution. Billboards are banned within 1,000 feet of historic zoning or National Register districts. Any sign work in a historic district needs a Certificate of Appropriateness.
On Timelines
A simple on-premise sign can get permits quickly, sometimes over the counter, sometimes within a couple of weeks. Atlanta's ordinance specifically requires a decision within 30 days. Getting a permit for signage installation in historic districts will take longer than for ordinary signs.
Sources
|
Hawaii is one of the four states in the country that completely ban billboards. Off-premise outdoor advertising is mostly prohibited by statute (HRS Chapter 445). Here, you'll mostly encounter on-premises signs advertising the businesses they're installed at. Another distinctive feature of Hawaii is that there are no incorporated cities or towns. This means that sign permit issuance is administered at the county level by four county jurisdictions. |
|
What Makes Hawaii Different
Hawaii is the oldest of the four ban states. The ban on billboards and off-premise advertising dates back to 1927. It grew out of a group called The Outdoor Circle, a women-led civic organization that, back in the 1920s, bought out and shut down the last billboard company. Off-premise advertising has been essentially nonexistent ever since.
Since Hawaii has no incorporated cities or towns, every sign permit is a county permit with no exceptions.
Scenic beauty and tourism are preserved by law. So expect aesthetic scrutiny on your sign, alongside size and placement rules.
Statewide Rules
The statewide billboard ban
Off-premise outdoor advertising is broadly prohibited throughout the state. You may find narrow exceptions for official notices, on-premises signs, and certain approved temporary or cultural notices.
County permitting, plus state highway control
There are no incorporated cities, so all sign permitting runs through one of the four counties. Hawaii's Department of Transportation adds another layer of control, tied into the federal highway program and Hawaii's Scenic Byways Program.
The Typical Permit Process
- Determine the county that will issue your sign permit. These counties are Honolulu, Maui, Hawaii, or Kauai.
- If you’re in Honolulu, you must go through a multi-step online application process. Apply, submit plans, get prescreened against a formatting checklist, go through plan review, then get your permit, inspection, and closeout.
- For installing signs in Maui County, submit your application through MAPPS, Maui's online permitting portal.
Notable Jurisdictions
Honolulu, covering the island of Oahu, is Hawaii's largest jurisdiction and a consolidated city-county. Here, the Department of Planning and Permitting handles everything. Sign rules are stated in Article 7 of the Land Use Ordinance. The ordinance's stated purpose includes preserving natural scenic beauty. Permits run through a multi-step online process.
Maui County, covering Maui, Molokai, and Lanai, regulates commercial signage under County Code Chapter 16.13, alongside the county's broader zoning title. Permits are handled entirely online through MAPPS, Maui's automated system.
Hawaii County, the Big Island, governs signs under County Code Chapter 3, which is administered by the Planning and Public Works Department. Non-temporary signs go through the same process as any other structure, and temporary sign limits vary by district.
Kauai County issues sign permits through the Building Division of Public Works, under its Comprehensive Zoning Ordinance.
Statewide highway corridors add another layer beyond county codes. Hawaii's DOT controls outdoor advertising along state and federal-aid highways. This is tied to both the federal program and Hawaii's own Scenic Byways Program.
On Timelines
It might not take long for smaller on-premises signs in some counties. Honolulu tends to be slower, as applications go through a multi-step review process across multiple agencies. If your plans don't pass the initial format checklist, you'll need to resubmit.
Sources
|
City or county authorities issue permits for installing signs in Idaho with two statewide layers on top. The first is an electrical permit through the Division of Occupational and Professional Licenses (DOPL) for illuminated or electronic signs. A separate state program is designed to issue permits for sign installation along interstate or federal highways. |
|
What Makes Idaho Different
Idaho bundles a state electrical permit requirement, a scenic byway billboard ban, and binding dark-sky sign-lighting rules. Any sign that's illuminated, electronic, or animated generally needs a separate state electrical permit.
Under Boise code, the city will approve or deny an on-premises sign permit within 5 working days. Once approved, that permit stays valid for a year. Boise also only allows static messages on electronic signs.
Ketchum and Sun Valley are nation-leading dark-sky communities. They require shielded lighting fixtures on signs and place real restrictions on neon.
Statewide Rules
The state electrical permit and contractor registration
You’ll need a special permit from Idaho's licensing division to install an illuminated, electronic, or animated sign. The installer should be registered as a contractor with the state.
Idaho Transportation Department (ITD) and outdoor advertising
If your sign is visible from an interstate or a federal-aid primary highway, it falls under Idaho's Transportation Department, which follows the federal Highway Beautification Act. New outdoor-advertising signs simply aren't allowed along Idaho's designated scenic byways. The existing ones can stay.
The Typical Permit Process
- Determine whether the area where you’ll install your sign is incorporated or unincorporated. The city permits signs if the area is incorporated. The county provides permits for unincorporated areas.
- Apply for the local sign/zoning permit with dimensions, a site plan, elevations, and design features.
- If your sign is freestanding, you'll likely need a separate local building or structural permit too.
- If it's illuminated, electronic, or animated, get your state electrical permit before work starts.
- Make sure your installer is registered with the state as a contractor.
- If your sign is visible from an interstate or federal-aid highway, file for an ITD outdoor-advertising permit.
Notable Jurisdictions
Boise is Idaho's largest city. It approves or denies within five working days, and an approved permit remains valid for a year. Applications go through an online portal. Electronic message displays must be static. Any sign in a historic district needs a Certificate of Appropriateness.
Coeur d'Alene is a resort and lake city. It has its own sign code, and generally requires a separate permit for each individual sign. An active Historic Preservation Commission and Downtown Core Working Group are tightening downtown design review.
Idaho Falls requires that anyone who installs a sign have a City license and the state's contractor registration. Commercial-zone signs must be constructed of non-combustible structural materials.
Ketchum and Sun Valley are resort communities with dark-sky policies. Ketchum was the first city in Idaho to earn International Dark Sky Community status. Your illuminated signs must have shields on lighting fixtures. Uplighting and neon lights are strictly restricted.
On Timelines
Each jurisdiction sets its own timeframe for approving or denying sign permits. Boise, for example, has set a five-working-day timeframe for an on-premises sign. If you need a separate building or structural permit, an electrical permit, or a historic-district review for your sign, the timeframe expands.
Sources
| Commercial sign permitting is local in Illinois for incorporated areas. Signs in unincorporated areas need permits from the counties. There is one statewide layer on top of that. This is the Illinois Department of Transportation (IDOT) control of off-premise billboards installed along interstate and primary highways. |
|
What Makes Illinois Different
According to Chicago's own code, any sign over 100 square feet, or over 24 feet above grade, requires a City Council Order in addition to a building permit.
Naperville completes the review within 14 calendar days. Springfield and Aurora both fold historic-district design review directly into their sign permit process. Springfield processes it through its H-zoning districts; Aurora does it through a required Certificate of Appropriateness.
Statewide Rules
IDOT and billboards
Off-premise signs along an interstate or primary highway need a separate state permit from the Illinois Department of Transportation. The local municipality issues permits for regular on-premise business signs. The state layer is applied only for billboards.
The Typical Permit Process
- Check the type, size, height, setback, and lighting rules for your specific zoning district. Find out whether you're in a historic or overlay area to apply for additional permits.
- Have your contractor prepare scaled drawings, a scaled site plan or survey, and structural calculations if it's a larger or freestanding sign.
- Apply through your municipality's portal or building department. Fees usually scale with your sign's square footage.
- If it's illuminated, you'll need a separate electrical permit and inspection.
- Depending on where you are, you might need more approvals stacked on top. In Chicago specifically, that could mean a Grant of Privilege for anything overhanging the public way, a City Council Order if you're over that size or height threshold, or a Certificate of Appropriateness if you're in a historic district elsewhere in the state.
- Once approved, schedule your inspections: a footing inspection for freestanding signs, plus electrical and final inspections.
Notable Jurisdictions
Chicago has the toughest process in the state. The Department of Buildings issues permits. The zoning and building reviews are handled separately. If your sign hangs over the sidewalk, both your alderman and the City Council must approve it. Signs over 100 square feet or over 24 feet need their own Council Order. Light-up signs also require a separate electrical permit. All of this together can take months.
Aurora, the state's second-largest city, uses a single combined permit covering signs, banners, and awnings. If your property sits in a designated Historic District, you'll also need a Certificate of Appropriateness.
By ordinance, Naperville city staff must grant or deny a complete sign request within 14 calendar days. Permanent wall and monument signs need a permit; monument and ground signs need a separate Electrician's Certification Form. Anything electrified needs its own electrical permit.
Rockford requires a permit for any permanent sign larger than 2 square feet. A licensed Outdoor Advertiser must install signs. Larger freestanding signs, specifically pole or pylon signs over 20 feet tall and over 240 square feet, or over 35 feet regardless of size, trigger a separate building permit.
Springfield requires a sign permit through its Building and Zoning office, and commercial sign plans need the seal of an Illinois-licensed architect or engineer. The city also maintains H-1, H-2, and H-3 historic zoning districts around its historic downtown, which add extra review for any signage there.
On Timelines
A simple wall or monument sign is often approved within a few weeks in most places. Naperville issues a decision within 14 calendar days. Chicago is the slowest among all, where getting sign permits can take a couple of months.
Sources
| On-premise signs in Indiana are permitted locally under home rule. There are two state-level layers, though. The Indiana Department of Homeland Security reviews sign construction for large ground signs. INDOT also has a dedicated Outdoor Advertising program for billboards along controlled routes. |
|
What Makes Indiana Different
Off-premise billboards along interstate and federal-aid control routes need INDOT permits, fees, spacing, and size limits under IC 8-23-20 and 105 IAC.
In 2024, a federal appeals court upheld an Evansville ordinance that blocks converting static billboards into digital ones. That gives Indiana cities firm footing to limit billboard digitization.
Statewide Rules
The state design release
Any ground sign with over 100 square feet of surface area, or any roof-mounted sign on a Class 1 structure, requires an Indiana Department of Homeland Security Construction Design Release. IDHS completes the review process within 10 business days.
The Typical Permit Process
- Determine which body will issue your permit. Cities or counties grant permits for on-premise business signs, not the state. Find out whether your property is inside or outside a municipal boundary.
- Check your local zoning code for the size, height, setback, and lighting limits. Some sign types are exempt, so check that too.
- Apply for the local permit, usually through an online portal.
- Put together the standard package: your application, scaled drawings, and a dimensioned site plan.
Notable Jurisdictions
Indianapolis regulates on-premises signs under its Revised Code, with permits issued by the Department of Business and Neighborhood Services through an online portal. Because Indianapolis and Marion County share a consolidated government, a single code covers the entire county.
Evansville requires two things: a Site Review or Improvement Location Permit through the Area Plan Commission and a separate on-premises sign permit. Evansville is also the city where converting static billboards to digital is restricted since 2024.
Fort Wayne, the state's second-largest city, regulates signs through its zoning ordinance, which has been reorganized to align with Allen County's, with permits handled through a joint planning department.
South Bend adopted a citywide form-based zoning code that prioritizes building form and the relationship between a property and the street. All sign types need a permit before being built, altered, or relocated, unless specifically exempt. Routine refacing is exempt.
Carmel, an affluent Indianapolis suburb, uses a consolidated development ordinance with strong design standards. It offers online sign permit applications, plus specialized forms for signs near roundabouts and for public events.
On Timelines
Simple wall signs in smaller jurisdictions can sometimes be approved over the counter. Larger cities like Indianapolis advise anticipating several weeks. Please note that incomplete submittals are the most common cause of delay. If your sign needs a state design release, expect up to 10 business days for that step. Off-premise INDOT billboard permits also take a long time.
Sources
| In Iowa, sign permits are mainly issued by local authorities. It has a State Building Code, but it’s flexible enough as local jurisdictions may adopt their own. There is a statewide layer referring to off-premise outdoor advertising visible from the primary highways. The Iowa DOT controls this under Iowa Code Chapter 306C. |
|
What Makes Iowa Different
Outdoor advertising is banned along Iowa's designated scenic byways. Some of the metros have their own codes with distinct downtown and historic-district rules.
Statewide Rules
The Iowa DOT requires a special permit for off-premise advertising signs visible from the primary highway systems under Iowa Code Chapter 306C and Iowa Administrative Code 761 Ch. 117. The signs must be located in commercial or industrial-zoned areas with proper spacing. They are totally banned along designated scenic byways.
There was an update in 2024 regarding digital signage under the federal Highway Beautification Act (stationary LED signs, no flashing/scrolling, 500-foot spacing between LED devices facing the same direction).
The Typical Permit Process
- Determine whether your sign is on- or off-premise. That tells you who to apply to. On-premise signs are governed locally, while off-premise signs visible from a primary highway also require Iowa DOT permitting.
- Apply through the local city's zoning/development services or building department for on-premise signs.
- Find out whether a permit is required for your sign, as most cities exempt small/temporary signs based on a size threshold.
- Verify allowances for signage size, height, number, and illumination.
- If you’ll install a sign on a property in a historic district, be ready for an additional review before the sign permit.
- Submit the application with a site plan, sign drawings, and electrical/structural details for illuminated or mounted signs.
- For billboards visible from the primary highway system, file a separate advertising-signs application with the Iowa DOT.
Notable Jurisdictions
Des Moines is the state's largest metro. It keeps the sign rules inside the general zoning ordinance through the Zoning Enforcement Division.
Cedar Rapids, the second-largest metro, has its own dedicated sign code (Chapter 33E), which works alongside the zoning ordinance and is administered by Development Services.
Davenport’s code includes a table listing every permitted sign type and whether each needs a permit. If your sign type isn't on that list, it's prohibited.
Iowa City, a university town, handles sign rules under its city code. Signs in historic districts must undergo a special review before receiving an installation permit.
Council Bluffs sits across the river from Omaha and is Iowa's main casino and gaming district. That makes its sign rules especially relevant for large resort signage and anything along the I-29 and I-80 corridors.
On Timelines
Check the information with your local authorities as timelines change from city to city.
Sources
| In Kansas, almost every on-premise signage permitting is governed locally. Each jurisdiction has its own code, as well as editions of the building and electrical codes. One mandatory statewide layer concerns off-premise advertising. Billboards that are adjacent to controlled state and federal-aid highways are regulated by the Kansas Department of Transportation (KDOT) under the Kansas Highway Advertising Control Act. |
|
What Makes Kansas Different
KDOT's billboard standards are set in K.S.A. 68-2234. These rules are unusually concrete. Some jurisdictions, such as Kansas City, Kansas, issue permits only to licensed and bonded sign installers.
Statewide Rules
KDOT outdoor advertising (K.S.A. 68-2234, 68-2236)
Under K.S.A. 68-2234, a billboard face can't exceed 30 feet high, 60 feet long, or 900 square feet per facing. Flashing or moving lights are prohibited. Under K.S.A. 68-2236, the permit carries a $250 nonrefundable processing fee. The state has to approve a compliant application within 60 days.
The Typical Permit Process
- Find out which jurisdiction will issue permits for your signs. If your sign is in an incorporated area, the city will grant a permit. The county issues permits for signs going to be installed in unincorporated areas.
- Determine whether your sign requires a permit. Most jurisdictions require one before any new permanent sign is put up, altered, relocated, rebuilt, or even refaced.
- Prepare two sets of sign and structure drawings with attachment details. Include a site plan showing where the sign will be installed.
- Check the zoning limits and discover what’s allowed regarding the sign type, size, etc.
- If it's a billboard next to a controlled highway, file separately with KDOT, with the $250 fee and a 60-day decision window.
Notable Jurisdictions
Wichita, the state's largest city, regulates signs under its own sign code. It’s administered jointly by the Wichita-Sedgwick County planning department. Off-site billboards need Special Review if proposed closer to residential zoning than allowed. Always make sure to include all existing sign locations and separations, or your application will get rejected.
Overland Park, a large Kansas City suburb, requires a permit for permanent signs. On the other hand, it doesn’t require permits for temporary signs.
Kansas City, Kansas, and Wyandotte County don’t allow any sign to be erected, altered, relocated, rebuilt, or refaced until the Unified Government issues a permit. These permits are issued only if the signs will be installed by a licensed and bonded sign installer, except for wall signs.
Topeka, the state capital, keeps sign rules in its zoning code. It allows direct illumination only in certain commercial, industrial, and downtown districts. It’s prohibited everywhere else.
Lawrence adds design review for signs in locally designated historic districts and downtown. Minor projects can be approved administratively. The Historic Resources Commission reviews major ones during monthly meetings.
On Timelines
A wall or ground sign meeting all standards is often permitted in a short time period, more specifically within a few business days to about two weeks. If your sign needs a variance, an off-site billboard review, or historic design review, it might take several weeks to a few months.
Sources
| Kentucky splits a sign permitting process into two layers. Your zoning and sign permits are handled by your city or county, under their own local ordinance. But billboards visible from state-maintained or federal-aid highways need a separate permit from the Kentucky Transportation Cabinet. |
|
What Makes Kentucky Different
Two specific things sit at the state level in Kentucky.
The first is billboards. The Transportation Cabinet runs an active permit program for them. The second one refers to the statewide Kentucky Building Code, which mandates that sign structure, wind, and electrical compliance are uniform statewide.
Louisville, Lexington, and Covington each add their own design review step, requiring a Certificate of Appropriateness before or alongside your regular sign permit.
Getting permission for sign installation in a historical district requires an additional review in addition to the ordinary sign permit.
Statewide Rules
Transportation Cabinet billboard permits
Off-premise billboards visible from state-maintained and federal-aid highways need a permit from the Transportation Cabinet, under the federal Highway Beautification Act. Converting a static billboard to an electronic one also requires a permit. Renewals run from November 1 to December 31. On-premise business signs are exempt from this program entirely.
The mandatory statewide building code
Your sign's structure, wind load, and electrical compliance all run on the Kentucky Building Code.
The Typical Permit Process
- Find out whether your sign requires a permit. On-premise signs are exempt from extra layers and need only a local permit. An off-premise billboard along a state or federal-aid highway needs the Transportation Cabinet permit too, so you’ll have to get it along with the ordinary permit.
- Identify your jurisdiction. The issuing office is usually your city or county's building inspection or planning division.
- Submit your local application, generally a form plus a site plan or building elevation showing location, dimensions, height, and setbacks. Some cities want more. Bowling Green, for example, requires plot-plan copies with an engineering stamp for permanent building-mounted signs.
- Check exemptions before you apply. Most places exempt certain small, non-illuminated, or temporary signs, but the thresholds are different everywhere.
- If you're in a local historic preservation overlay, get your Certificate of Appropriateness before or alongside zoning review.
- Finally, verify that your construction complies with the statewide building code and passes any required inspections.
Notable Jurisdictions
Louisville Metro, the state's largest city, keeps sign rules in its Land Development Code. Permanent signs need a permit unless specifically exempt. If your property is an individual landmark or sits in a local preservation district, you'll need a Certificate of Appropriateness from the city's landmarks commission.
Lexington-Fayette County is a consolidated city-county government. No sign can be erected, relocated, or altered without a permit from the Division of Building Inspection. The city's historic overlay covers roughly 15 districts, and any sign change in those areas needs a Certificate of Appropriateness, with substantial changes going before the Board of Architectural Review at public hearings.
Covington, the largest city in Northern Kentucky, governs signs through its zoning ordinance, with separate rules for downtown and historic districts. If you're in a Historic Preservation overlay, you'll need approval from the Historic Preservation Officer before zoning review even begins.
Bowling Green requires a plot plan bearing an engineering stamp for permanent building-mounted signs. Temporary non-building signs require a permit that expires after 30 days and is renewable for $25 up to 3 times, capped at 120 days per year, with a tracking seal affixed to the sign.
On Timelines
Since permitting is local, timelines vary. On-premise permits in the larger metros are commonly issued within one to three weeks. If you need a variance or a historic-overlay Certificate of Appropriateness, it will add time.
Sources
| Louisiana permits on-premise signs at the local level, under each jurisdiction's own zoning code. It is located on the Gulf Coast, and a mandatory statewide building code enforces Gulf Coast wind-engineered design standards. The second state layer above local sign permitting is a separate permitting program from the Louisiana DOTD Office of Outdoor Advertising, which licenses off-premise billboards along interstate and primary highways. |
|
What Makes Louisiana Different
Louisiana enforces a mandatory statewide building code, based on the 2021 International Building Code with Louisiana amendments, effective January 2023. Freestanding and large signs have to be engineered to Gulf Coast wind speeds.
New Orleans runs one of the more restrictive urban sign regimes in the country. In the French Quarter, the Vieux Carré Commission has to approve any exterior change to signage. The Commission's rules favor traditional wood, metal, and hand-painted signs over internally illuminated, plastic, and vinyl ones. Other New Orleans historic districts require extra approval from a separate landmarks commission.
Several Louisiana governments are consolidated city-parish entities, including Baton Rouge, Lafayette, and Shreveport. That folds city and parish permitting into a single office and code.
Statewide Rules
The statewide building code and wind loads
Louisiana's building code is mandatory statewide. This code is based on the 2021 IBC with state amendments. Freestanding and larger signs have to meet its structural and wind-load provisions. The closer your sign is to the coast, the higher the design wind speed it has to withstand.
State billboard licensing
Louisiana's Department of Transportation and Development licenses and permits off-premise billboards along interstate and primary highways, under the federal Highway Beautification Act. You need an outdoor advertising license first, and the application requires a plot plan and construction specifications. On-premise business signs at their own location are generally exempt from this program.
The Typical Permit Process
- Start by determining which jurisdiction controls.
- Confirm whether your sign is on-premise. Those are permitted locally and generally don't need a state permit. Off-premise billboards along interstate or primary highways do.
- Apply through your local permit office, often through an online portal.
- Submit scaled drawings showing dimensions, copy, location, and mounting details. You should also provide extra details for electrical signs.
Notable Jurisdictions
New Orleans permits signs through its Department of Safety and Permits, under the Comprehensive Zoning Ordinance. The French Quarter requires Vieux Carré Commission review. It favors traditional wood, metal, and hand-painted signs over internally illuminated, plastic, and vinyl ones. Other historic districts require approval from the Historic District Landmarks Commission before any exterior work.
Baton Rouge and East Baton Rouge Parish operate as a consolidated city-parish government, with sign rules in the Unified Development Code. The permits are issued through the Office of Permit and Inspection via an online portal.
Shreveport and Caddo Parish require a sign permit to erect, alter, or relocate a sign within the city and inside Caddo Parish planning limits. Applications go through the joint Metropolitan Planning Commission permit center.
Lafayette is also a consolidated government, regulating signs through its Unified Development Code. Recent code changes ease sign rules and post-storm replacement, reflecting the region’s hurricane exposure.
On Timelines
Getting permits for an on-premise wall or monument sign in a city is relatively quick. It may take multiple weeks to months to get a sign permit for a freestanding sign that requires a structural or historic review. The same applies to off-premise state billboard permits.
Sources
| Maine bans off-premise billboards statewide. Roadside business visibility runs through MaineDOT’s directional and logo sign programs instead. Storefront signs are permitted under local codes layered over statewide on-premise caps in Title 23. |
|
What Makes Maine Different
The billboard ban is the defining feature of Maine. The Legislature passed it in 1977, and it took effect January 1, 1978.
Maine's DOT administers Official Business Directional Signs, an Interstate Logo program covering gas, food, lodging, camping, and attractions, and tourist-oriented directional signs.
A license or permit generally isn't required for an on-premise sign. Instead, Maine sets statewide caps that apply on top of local zoning. Signs on any property can't exceed 10 in number, and the maximum height is 25 feet above ground level. If the sign is attached to a building, it can rise up to 10 feet above the roofline.
Tourism gateway towns near Acadia add another layer. Bar Harbor combines historic-district design review with dark-sky lighting limits.
Statewide Rules
The billboard ban and state sign programs
Traditional off-premise billboards are illegal statewide. Roadside business visibility comes only through MaineDOT-administered programs: Official Business Directional Signs, the Interstate Logo program, and tourist-oriented directional signs. These are applied for through MaineDOT's Right-of-Way Control office and require local approval as well.
Statewide on-premise caps
On-premise signs face statewide limits regardless of what your town allows. Generally that means a maximum of 10 signs per property, a 25-foot height limit, and location within 1,000 feet of the principal building. Illuminated signs should be shielded from direct glare to comply with dark-sky policy. Flashing or moving lights are also prohibited.
The Typical Permit Process
- Apply to your municipal code enforcement or permitting department if your sign is on-premise. You'll generally need a drawing showing dimensions, mounting, location, and illumination. Many towns also ask for photos.
- Submit your application electronically if you’re in Portland. Get a UL Classification Mark for illuminated signs, and a certificate of flammability for awnings or canopies.
- If you're in a historic or design-overlay district, expect additional design review and tighter rules.
- Meet the statewide on-premise caps in addition to whatever your local rules require.
Notable Jurisdictions
Portland, the state's largest city, handles signage and awning permits electronically through Permitting and Inspections. Illuminated signs require a UL Classification Mark. The city has 12 historic districts that require design review.
Bangor issues sign permits through its Land Development Code. Applications need the fee plus scaled plans. The permit is considered void if sign work isn't completed within six months of issuance.
Bar Harbor, an Acadia gateway town, has some of the strongest controls in the state. Internally illuminated signs are prohibited in its Downtown, Town Hill, and Village Historic Districts. Outdoor neon is generally prohibited, and roof signs are limited. Illuminated signage faces brightness limits.
Lewiston keeps sign rules in its Zoning and Land Use Code. It has specific provisions that address temporary sign caps and preserve passable pedestrian areas. Some limited signage is allowed without a permit.
MaineDOT functions as the de facto regulator for roadside business visibility statewide, administering the Official Business Directional Sign program, the Interstate Logo program, and tourist-oriented directional signs.
On Timelines
Timelines vary from town to town. It’s easier and faster to get permits for on-premise signs. It might take a few days or weeks once you've submitted a complete scaled application. If you plan to put up a sign in a historic district, like Portland's 12 districts or Bar Harbor's, the timeframe will extend.
Sources
| There's no single statewide sign permit in Maryland. You should contact the local county or municipality to obtain building permits for your signs. Maryland Building Performance Standards require every jurisdiction in the state to use the same edition of the same building codes. Local governments can amend those codes to fit local conditions. |
|
What Makes Maryland Different
Baltimore City and Baltimore County are entirely separate jurisdictions with entirely separate codes. This trips people up constantly. The City uses its own Zoning Code and sign table. The County has its own Zoning Regulations and a completely different Table of Sign Regulations.
Under Maryland's own regulations, each local jurisdiction may modify the state standards to address local conditions. If a local amendment conflicts with the state provisions, the local amendment prevails in that jurisdiction.
Statewide Rules
The Maryland Building Performance Standards
Every jurisdiction must use the same edition of the International Building Code, though each may amend it locally. Permits are issued and enforced entirely at the local level. The IBC's Appendix H is the model sign-construction chapter. It's only enforceable where a jurisdiction has explicitly adopted it.
State outdoor advertising permits
Outdoor advertising signs near a state highway need a separate permit from Maryland's Department of Transportation.
The Typical Permit Process
- Identify your property's local zoning district and check the applicable sign table or ordinance.
- If your property sits in a designated historic district, get historic preservation approval before applying for the sign permit.
- Prepare your submittal drawings.
- Apply for the sign permit through your local permitting office.
- Add an electrical permit for any illuminated sign.
- Go through plan review and approval.
- Separately, if your sign is outdoor advertising near a state highway, get the state permit too.
Notable Jurisdictions
Baltimore City governs signs under its Zoning Code, Title 17, using a detailed table that sets forth allowed sign types, approval methods, maximum area, placement, and quantity. Signs in the historic district need an additional review, issued by the city's Commission for Historical and Architectural Preservation.
Montgomery County issues permits through its Department of Permitting Services. The submissions are online. A permit is required to construct, erect, move, enlarge, illuminate, or substantially alter a sign. Notably, both the property owner and the sign installer must file a joint application. Nonconforming signs require a variance from the county's Sign Review Board.
Annapolis has a strong historic district overlay. Any new or altered exterior sign in the historic district requires a Historic Preservation Commission application and a Certificate of Approval before the sign permit is filed. The Commission reviews each application individually rather than against fixed standards. Permits are filed through the city's online portal.
Frederick requires HPC approval for all exterior work, including signage in its downtown historic district, before the sign permit is issued. In the Downtown Commercial/Residential district, a single sandwich-board sign placed in front of the business and removed each night is allowed without HPC approval or a permit.
On Timelines
Timelines depend heavily on the jurisdiction and the type of signage. A wall sign in a permissive commercial district can be approved relatively quickly, either over the counter or online. Signs needing a historic Certificate of Approval, design review, or a zoning variance add weeks to months.
Sources
- Maryland OneStop - Outdoor Advertising Sign Permit
- Maryland - building codes (MBPS)
- Baltimore City Zoning Code (signs, Title 17)
- Baltimore County Zoning Regulations, Section 450 (signs)
- Montgomery County DPS - sign permit
- Annapolis - guide for sign permits
- Frederick - historic preservation guidelines
| Massachusetts has two statewide layers. The first is the statewide code 780 CMR, which includes a sign appendix and sets the construction and exemption baselines. The actual limits on sign size, placement, and illumination are set by each city or town's zoning ordinance. Off-premise billboards fall under a separate MassDOT state track. |
|
What Makes Massachusetts Different
Massachusetts is home to a large number of local historic districts statewide under MGL c. 40C (commonly cited at over 200). In these areas, you generally need a Certificate of Appropriateness before a sign permit can be issued. These commissions typically meet monthly.
Statewide Rules
The state building code
Sign construction follows the Massachusetts State Building Code, which includes a sign appendix. Certain signs are exempt from a building permit, including painted non-illuminated signs and very small projecting signs. A construction supervisor license isn't required to erect signs, though a permit may still be required. Illuminated signs must comply with the Massachusetts Electrical Code, so you should get an electrical permit.
State outdoor advertising
Off-premise billboards are regulated separately by the state's Office of Outdoor Advertising, which issues annual permits and licenses operators. This is an entirely distinct track from your local on-premise sign permit.
The Typical Permit Process
- Confirm your zoning district and whether it lies within a local historic district.
- Check your proposed sign against the municipal zoning ordinance.
- If you're within a local historic district, get a Certificate of Appropriateness from the historic district commission.
- If your sign exceeds zoning limits, you'll need a variance or special permit from the local zoning board of appeals.
- Submit your sign permit application to the municipal building or inspectional services department.
Notable Jurisdictions
Boston governs on-premise signs through its Zoning Code’s Article 11, administered by Inspectional Services. The Planning and Development Agency conducts design review for many projects. The zoning relief is handled through the Zoning Board of Appeal. Boston also contains multiple local historic districts, including Beacon Hill, Back Bay, and the South End, whose commissions review signage before any permit is issued.
Cambridge requires two separate approvals before obtaining a sign permit. The Community Development Department provides sign certification, which is part of the application review but doesn't issue the permit itself. Inspectional Services issues the actual permit after all review steps are complete. On top of that, the City Council must approve any sign extending six inches or more from the building face.
Worcester keeps sign regulations in its zoning ordinance, with allowances varying by Business, Manufacturing, and Residential-Office districts. The city pushes online permit submission through its portal. A number of small or temporary sign categories are exempt.
Springfield requires commercial signs to conform to the dimensional standards in its zoning ordinance. Installing, altering, or removing a sign requires a building permit from the Building Commissioner, with Planning and Code Enforcement jointly identifying which regulations apply.
Nantucket runs distinctive island-wide sign control. Applications go through the Historic District Commission's Certificate of Appropriateness process. A Sign Advisory Council reviews the design against published guidelines before the Commission's final vote.
On Timelines
Official pages generally don't publish guaranteed turnarounds. A wall sign in a town with online permitting can be a quick administrative approval. Anything that triggers historic district review, design review, or a zoning variance adds public hearings and can last for several weeks or a few months.
Sources
| In Michigan, on-premise sign permitting is generally handled locally. It is issued by a city or township. Municipalities set regulations regarding sign size, height, illumination, and other features through their zoning ordinances. Most signs require a permit if a new business sign is installed or re-faced. Billboards and historic districts add extra layers. |
|
What Makes Michigan Different
You’ll face three layers of approval for signs in Michigan. The first is the local on-premise permit. Then comes the permit granted by MDOT’s independent billboard authority for installing billboards along controlled highways. Some local units also require an annual permit for each sign.
Statewide Rules
MDOT Highway Advertising Act (Act 106 of 1972)
If your sign is off-premise or a billboard along an interstate highway, it requires an additional permit from MDOT Highway Advertising. It defines location, size, lighting, and spacing of the sign. As a general rule, a digital billboard cannot be located within 1,750 feet of another sign holding a digital billboard permit on either side of the highway, facing the same direction as oncoming traffic (the statute contains limited exceptions). This rule functions independently from any local sign permit.
Annual sign permit concept (MCL 252.304)
Local units have the right to require an annual permit for signs.
The Typical Permit Process
- Identify the zone district, confirm whether your sign is permitted and whether there are any limiting circumstances.
- If your sign is in the historic district, make sure to get a Certificate of Appropriateness from the local Historic District Commission.
- Prepare corresponding paperwork, including the site plat with dimensions and setbacks.
- Submit through the municipality’s permitting portal.
Notable Jurisdictions
Detroit accepts permits through the ACCELA eLaps portal by a holder of a current City of Detroit Sign License. You should also upload drawings via ProjectDox. Special areas like the Central Business District and Riverfront have their own rules for signage character.
In Grand Rapids, signs are governed by Article 51 of the Zoning Ordinance and Michigan Building Code. The applications are processed through the Citizen Access portal.
In Ann Arbor, signs are regulated by the Unified Development Code and submitted via the STREAM portal. The city controls sign designs strictly. Signs that blink or scroll are not allowed. The illuminated signs should have shielding, and there are also limits on electronic message centers. Historic district signs must also get a Certificate of Appropriateness before getting the main permit.
On Timelines
Each jurisdiction has its own timeline. Simple wall signs in smaller townships can get approvals in days. It may take longer for larger signs or signs in historic districts to obtain permits.
Sources
| On-premises signs are permitted by the city in accordance with local zoning ordinances. Minnesota State Building Code adds a statewide layer under Minn. Stat. 326B.121. It supersedes any conflicting municipal building code and governs the structural and electrical side of larger signs. Billboards along interstate highways need a separate MnDOT advertising-device permit. |
|
What Makes Minnesota Different
The Capitol Area Architectural and Planning Board in St. Paul imposes a separate sign-design review layer around the State Capitol, in addition to the normal sign-permitting process. It is subject to strict viewshed standards.
Statewide Rules
Minnesota State Building Code (Minn. Stat. 326B.121)
There is a building code that’s mandatory throughout Minnesota. Minn. Stat. 326B.121 preempts conflicting local building codes, establishing uniform structural and electrical baselines for signs statewide.
MnDOT advertising devices (Minn. Stat. ch. 173)
The billboard permits granted by MnDOT renew annually. The off-premise signs are limited to business-, industrial-, and commercial-zoned land. In unzoned areas, signs must sit within 800 feet of the business activity that qualifies the location.
The Typical Permit Process
- Identify the city and county with corresponding jurisdiction. Have in mind that permits for on-premise signs are local.
- Submit the city application with a site plan, dimensions, and elevations. You should also present a survey regarding freestanding signs.
- If your sign is illuminated, add an electrical permit.
- Add building code and structural review for larger freestanding signs.
Notable Jurisdictions
On-premise signs are governed by Chapter 543 of the Minneapolis zoning code. Signs under eight sq ft, portable signs under 12 sq ft, temporary signs under eight sq ft and six ft tall are exempt from a permit.
You need a permit for all the business signs visible from a public right-of-way in Saint Paul under Chapter 64 of the zoning code. The permit is also needed for refacing an existing sign. Illuminated signs need an added electrical permit. If the signage is in the historic district, a review by the Heritage Preservation Commission is required.
In the St. Paul Capitol Area (CAAPB), the Capitol Area Architectural and Planning Board regulates signs on public and private properties. It adds a design review layer under the State Capitol under Minn. Rules ch. 2400 on top of normal sign permitting. Stricter aesthetic and viewshed standards are applied.
You need a zoning permit for most signs in Duluth. The applications are accepted online via ePlace. There is a mandatory building code review for pole or ground signs over six feet tall and for projecting signs.
Rochester is home to Mayo Clinic Destination Medical Center downtown district, with its own design guidelines. Downtown sign height and digital sign rules have been modified over time, so confirm the details with Rochester Community Development.
On Timelines
You might get a permit for a small wall sign with no complex structures either over the counter or within days. Freestanding or illuminated signs take longer, as they require an additional structural review and an electrical permit. The same applies to signs in historic districts. MnDOT billboard permits carry a 30-day determination period.
Sources
| Commercial on-premise signs are regulated locally in Mississippi, under each jurisdiction's own ordinance. There is a statewide layer for off-premise outdoor advertising signs situated along state-controlled routes. A second layer is the Gulf Coast’s post-Katrina wind/building regime in the six counties. |
|
What Makes Mississippi Different
There is a statewide billboard layer regulated by MDOT under Title 49, Chapter 23. A hurricane wind regime is applied for signs in the Gulf Coast.
Statewide Rules
MDOT outdoor advertising (Miss. Code Title 49, Ch. 23)
Off-premise billboards on Interstate or federal-aid primary highways need an MDOT permit before erection. Under Miss. Code § 49-23-5, no outdoor advertising may go up within 660 feet of the right-of-way edge where it's visible from a state-controlled route.
Two signs can't sit less than 500 feet apart, in cities or in zoned and unzoned commercial or industrial areas. Signs built after July 1, 2003 are capped at 672 square feet where two faces point the same direction. In unzoned areas, the qualifying commercial area extends no more than 800 feet from the business.
Gulf Coast wind regime
Hancock, Harrison, Jackson, George, Pearl River, and Stone are located in Gulf Coast wind zones, so sign structures there commonly require engineered wind-load documentation. The regulations were tightened after Hurricane Katrina. Confirm the design wind speed for a given location.
The Typical Permit Process
- Determine the type of your signs and whether they fall under local ordinance.
- Identify the governing department for on-premise signs.
- Complete the local application with a site plan and sign drawings showing height, setback, and location.
- Verify the fee schedule and submittal checklist with the local office.
Notable Jurisdictions
Jackson is the state capital and largest city. Sign permits are issued by the Signs and License Division within Planning & Development, under Code Chapter 102 and the zoning sign regulations.
Gulfport is the second-largest city on the coast. Sign permits are regulated by Urban Development/Planning & Zoning, as well as coastal wind-zone building requirements. You have 45 days from the date city staff approves your paperwork to pay your fees and officially pick up your physical permit, or the approval will be void and you will have to restart the process.
Natchez is a historic river city where a Certificate of Appropriateness is required for signs. This Certificate is issued by the nine-member Preservation Commission in addition to a sign permit.
Biloxi is a coastal casino and resort area. The Gaming Establishments ordinance regulates gaming projects, which must comply with all permit and zoning requirements. Gaming signs must also satisfy the Mississippi Gaming Commission.
On Timelines
Timelines depend on jurisdiction. Simpler projects, such as wall or window signs, can be done over the counter or may take a few business days. Sign permits in historic districts or requiring coastal wind-load engineering may run several weeks. Gulfport's staff approval of a sign application expires after 45 days if a permit isn't issued.
Sources
| The on-premise sign permits are handled locally. The one statewide layer is MoDOT’s Outdoor Advertising program, which regulates permitting for off-premise billboards along controlled highways. |
|
What Makes Missouri Different
The statewide layer is regarding billboards along controlled highways regulated by MoDOT’s centralized Outdoor Advertising program.
Statewide Rules
No statewide building or sign code
This state specifies that it doesn’t have a statewide building or sign code. Where no local code is adopted, you should check the 2021 IBC as a default standard.
MoDOT Outdoor Advertising (226.500-226.600 RSMo)
Off-premise billboards along Interstate, NHS, and designated Federal-aid primary routes require a $200 application fee, a permit that expires if you don't erect the sign within two years, and a minimum of 1,400 feet between your sign and the nearest permitted sign on the same side of the highway.
The Typical Permit Process
- Determine the sign type and jurisdiction. The on-premise sign is permitted by a local city or county building or zoning department.
- For an on-premise sign, file with the local department including dimensions, area, height, and illumination.
- Add structural/foundation review and engineered drawings for freestanding monument or pylon signs.
- Pay local fees and schedule any required inspections.
Notable Jurisdictions
In Kansas City, sign regulations are set in the Zoning and Development Code 88-445. You are allowed to install billboards only on M1 or M-5 industrial zones. A Council-approved Signage Plan path allows a digital sign face on a monument sign for large lots subject to public hearings.
Sign permits in St. Louis are issued by the Building Division. If the sign is situated in historic districts or on City landmarks, the applications are automatically redirected to the Cultural Resources Office. No permit can be issued without CRO or Preservation Board approval. Most CRO (Cultural Resources Office) permits take about five working days to be approved.
Signs in Springfield are governed by the Land Development Code. The city issues a dedicated Sign permit through its eCity/Building Development Service portal.
In Columbia, the sign regulations are set under Chapter 29, which is a Unified Development Code. Citizen Self Service portal is where permits are filed via Building & Site Development.
Jefferson City regulates sign permits under Chapter 3 of the City Code. They are administered by Building Regulations. You need to get a sign permit before placing a new one. Wall-sign and freestanding sign allowances are set by the zoning district.
On Timelines
Missouri has no statewide sign code, so timelines vary by jurisdiction. Simple wall-sign permits may take from one to a few business days. The structural review needed for a freestanding sign, as well as signs in historic districts, prolongs the timeframe. Most CRO permits are effective within five working days.
Sources
| On-premise signs are administered locally and governed by a city or county zoning board. A state layer is effective for off-premise billboards that are along Interstate, NHS, and primary highways. Montana DOT issues permits under the Montana Outdoor Advertising Act. This state doesn’t ban the installation of billboards, but it strictly controls them. |
|
What Makes Montana Different
Montana allowed digital billboards along its highways under the rule ARM 18.6.237. Permits run on a three-year cycle, where most states renew annually. MDT inspects the proposed site in the field before approving it.
Billboards can only go in commercial or industrial zones, or in unzoned areas where a real business already operates. In unzoned areas, your sign must be within 600 feet of that business's permanent building and on the same side of the highway.
Statewide Rules
MDT Outdoor Advertising (Title 75, Ch. 15, MCA)
Off-premise billboards along Interstate, NHS, and primary highways require a separate Montana DOT permit. It’s regulated by the Montana Outdoor Advertising Act and the federal Highway Beautification Act. You can install billboards only in zoned or unzoned commercial or industrial areas.
Billboard faces can't exceed 672 square feet, 48 feet in length, or 30 feet in height. Signs must sit 500 feet apart on interstates, or 300 feet on other primary routes. Outside cities, they also need 500 feet of clearance from parks, forests, rest areas, and interchanges.
Inside cities of 5,000 or more, control extends 660 feet from the right-of-way. Outside them, it extends as far as the sign is readable.
Digital billboards
Digital and electronic billboards are allowed along controlled highways under ARM 18.6.237, but only in areas zoned commercial or industrial within a city's limits or urban area. The rule sets requirements for static display time, transition speed, and brightness with automatic dimming. Confirm current figures with MDT before finalizing a design.
The Typical Permit Process
- Apply through the city or county for on-premise signs.
- Submit scaled drawings, a site plan, building elevations, and pay the local fee. In some cities, you may also need to provide structural or engineering drawings.
- Billings files via the CityView portal.
- For off-premise billboards along Interstate, NHS, primary highways, file an MDT Outdoor Advertising application with the Right-of-Way Bureau, including a landowner affidavit and local zoning certificate.
Notable Jurisdictions
Billings is Montana’s largest city where sign permits are regulated by the Planning Division via the CityView portal. Sign rules are under the zoning code (Article 27-1400). A sign permit is needed to erect, enlarge, move, or convert any signage.
Sign rules in Missoula are in Municipal Code Title 20, Ch. 20.75. All ground signs over six feet require permits. You must have the Engineering Division's approval before the final sign permit is approved.
Bozeman is a fast-growing city with a modern Unified Development Code (Division 38.560). All signs require a sign permit, including banners and temporary signs unless expressly exempt.
Great Falls holds the sign code in Chapter 60 of the Land Development Code, with applications through Planning and Community Development and an interactive zoning map to confirm district requirements by address.
On Timelines
Timelines vary by jurisdiction. Permits for simple, code-compliant signs are granted within days to a few weeks. If the project needs a structural review, a comprehensive sign plan, a variance, or is located in an overlay, it takes longer.
Sources
| Commercial sign permitting is administered at the local level. There is no statewide permit for on-premise signs. Nebraska state-level layers include NDOT’s Highway Beautification Control System, which governs off-premise billboards, and the Nebraska Byways program. The latter bans new off-premise billboards visible from any designated scenic byway. |
|
What Makes Nebraska Different
Nebraska’s major cities require a licensed sign installer to install the sign. Omaha calls them a “master sign erector”. In Lincoln, they’re referred to as a “registered sign contractor,” while in Grand Island, they’re called “sign hangers”.
Signs along scenic byways are prohibited, with a few exceptions. Even directional signs allowed are capped at 150 square feet, with no logos permitted.
Statewide Rules
State highway sign control
Nebraska's Department of Transportation regulates off-premise billboards visible from interstates, federal-aid primary routes, and the National Highway System. The Department also regulates scenic byways.
The scenic byway prohibition
You cannot install any new sign visible from the main-traveled way of a designated Nebraska scenic byway. Exceptions include official, on-premises, directional, and farm- or ranch-directional signs. New off-premise billboards are prohibited outright. Allowed directional signs are capped at 150 square feet and can't use logos.
The Typical Permit Process
- Start by identifying the controlling jurisdiction. Check whether your site falls within a city's extraterritorial jurisdiction.
- Determine whether your sign is on-premise, which needs only a local permit. If it’s an off-premise sign near a state highway or byway, you’ll need an additional state permit.
- Check whether a licensed or registered sign contractor is required.
- Submit your local application with sign dimensions, area, height, materials, structural and electrical details, and a site plan. Illuminated signs typically require an electrical permit.
Notable Jurisdictions
Omaha, the state's largest metro, splits sign regulations across two chapters of its municipal code. The first one covers construction and administration. The other one covers zoning-based area, height, and district rules. Those rules apply within the city and its three-mile extraterritorial jurisdiction.
Permit applications must be submitted by a licensed master sign erector or a Nebraska-licensed architect or engineer. Illuminated signs require an electrical permit pulled before the sign permit.
Lincoln, the state capital, keeps sign rules in Title 22 of its code. Anyone erecting or altering signs in the city, or within three miles of it, must register as a sign contractor. They should also post a bond and carry liability insurance. Directional, parking lot, and informational signs under 6 square feet or 6 feet tall are exempt from permit requirements.
Grand Island, the largest city in central Nebraska, requires that only a licensed sign hanger may erect, move, or alter a sign. The one exception is that a property owner or tenant may install signs on their own property within certain limits.
On Timelines
In smaller cities, permits for simple wall or monument signs may take a few business days. If you’re installing a sign in Omaha and Lincoln, you should expect a multi-step review. It will cover zoning, building and structural, plus a separate electrical permit for illuminated signs. This process might take from a few business days to weeks.
Sources
| Commercial sign permitting in Nevada is governed by a city or county ordinance. Each jurisdiction has its own ordinance. On-premise signs almost always need a local sign permit. If it’s an illuminated sign, a separate building/electrical permit is required. Illuminated signs generally must be installed by an appropriately licensed Nevada contractor; confirm licensing requirements with the local jurisdiction and the Nevada State Contractors Board. |
|
What Makes Nevada Different
Clark County's sign code controls digital-sign luminance countywide. It expressly exempts the Las Vegas Boulevard Gaming Corridor (defined in NRS 463.3076). That exemption is why the Strip can run animated and electronic signage, which is capped everywhere else in the county.
The Strip is located in unincorporated Clark County (Title 30), not the City of Las Vegas (Title 19.14), which are two different codes within the same county. Las Vegas calls the approval not a “permit” but a “sign certificate”.
Any sign in the Lake Tahoe basin needs a Tahoe Regional Planning Agency environmental sign permit. It considers land-coverage calculations, restrictive illumination, and Pantone-only colors for internally lit signs.
Statewide Rules
NDOT outdoor advertising (NRS/NAC Ch. 410)
NDOT controls off-premise billboards within 660 feet of interstate and federal-aid highways under NRS/NAC Chapter 410. It issues its own permits, spacing caps, and size caps, in addition to local permits. In Las Vegas, you can't get a sign certificate for an off-premise sign without the state permit in hand.
Structural design (2018 IBC)
Signs in Nevada must comply with the wind (IBC 1609) and seismic (IBC 1613) design requirements. NRS 278.580 directs local governments to adopt the IBC's seismic provisions. You’ll need additional structural review for freestanding and large signs.
The Typical Permit Process
- Identify the controlling jurisdiction. Las Vegas (city), Clark County (the Strip and most unincorporated areas), Henderson, North Las Vegas, Reno, Sparks, and Carson City each have separate codes.
- Apply for the local sign permit before constructing or modifying an on-premise sign. Larger or multi-tenant signs may require an approved Master/Comprehensive Sign Plan first.
- Submit your application with a site plan showing setbacks, sign elevations with dimensions, materials, mounting, and illumination scheme.
Notable Jurisdictions
The City of Las Vegas requires a “sign certificate” (Title 19.14) before on-premise sign installation or any type of modification. You must contract a city- and state-licensed installer to complete your sign installation. A Special Use Permit and the State of Nevada permits are required for off-premise installations.
Title 30 (Ch. 30.72) regulates most of the Las Vegas Strip in Unincorporated Clark County. Limits are set for all digital-sign luminance countywide EXCEPT inside the Las Vegas Boulevard Gaming Corridor as defined in NRS 463.3076.
The City of Henderson permits permanent signs through a two-step review process. Community Development handles sign code and Master Sign Plan review, and the Building Department handles building code review. As an applicant, you must check for an existing Master Sign Plan first.
In the City of Reno, the Land Development Code, Ch. 18.05, regulates commercial signs. Zoning, building, and safety compliance are reviewed through the regional permit portal. If the sign is in a historic district, then it will need an additional permit. Signs visible from a state highway may require NDOT documentation.
On Timelines
Timelines depend on jurisdiction and complexity of the signs. Standard sign permits for on-premise simple signs are obtained fast. Special-district, design-review, Master/Comprehensive Sign Plan, off-premise (NDOT), and Tahoe basin (TRPA) signs require longer time due to expected discretionary hearings or environmental review.
Sources
| On-premise commercial signs are regulated at the local level in this state, based on each city’s or town’s adopted sign ordinances. Off-premise billboards along Interstate, federal-aid primary, and turnpike systems need a separate NH DOT permit under RSA chapter 236. New Hampshire allows billboards, but it bans them on scenic byways. |
|
What Makes New Hampshire Different
Towns in this state can lawfully ban electronic/changeable-copy signs outright. Billboards are prohibited on designated scenic and cultural byways (RSA 238:24).
You’ll need a Historic District Commission Certificate of Approval for signs in the historic districts. These commissions typically meet monthly, so build that into your timeline.
Statewide Rules
Off-premise billboards along interstate, federal-aid primary, and turnpike systems require a NH DOT permit under RSA chapter 236. Fees are tiered by size (RSA 236:72: $50 for up to 50 sq ft; $75 for over 50 but under 350 sq ft; $100 for 350 sq ft or more). The annual expiration date is April 1. Billboards are prohibited on designated scenic and cultural byways (RSA 238:24).
Local control + content neutrality
Local municipalities' zoning ordinances regulate on-premise signs under RSA 674:16-17. The signage size, height, illumination, and number limits differ by town. Towns may lawfully ban digital and electronic message-center signs.
The Typical Permit Process
- Determine whether your sign is on-premises, off-premises, or on a billboard.
- For on-premise signs, identify the jurisdiction and zoning district.
- Apply at the municipal office with scale drawings. These drawings should show dimensions, copy area, height, setback, illumination, and structural/electrical details.
- For signs in historic districts, such as Portsmouth, you should obtain a Certificate of Approval from the Historic District Commission.
- Get an additional electrical permit for illuminated or electronic signs.
- Secure local zoning approval for a billboard.
Notable Jurisdictions
Manchester is NH’s largest city, where on-premise signs are issued by the Building Division under the sign regulations in the Zoning Ordinance (Article 9). Illuminated or electronic signs require electrical permitting.
Nashua is the second-largest city where sign rules are in the Land Use Code (Article X). There are district-specific allowances and reduced ground-sign height.
Concord is the state capital. Sign regulations are in the zoning ordinance (Article 28-6); electronic changeable-copy signs are banned.
Portsmouth is a historic coastal city that requires a Certificate of Approval from the Historic District Commission for signs in the Historic District.
Bedford is a suburb with an aesthetic-driven ordinance. Here, externally lit signs are encouraged over internally lit ones. Any animated, moving, flashing, and changeable readerboard signs are banned.
On Timelines
Permits for standard on-premises signs may require a brief administrative review. If you need a Zoning Board variance or a special exception, expect longer timeframes. The timeline may be extended for signs requiring a Certificate of Approval from the Historic District Commission.
Sources
| In New Jersey, zoning codes are set locally. The state also adds two layers regarding permanent signs. You’re required to obtain a construction permit under the statewide Uniform Construction Code (N.J.A.C. 5:23) on top of local zoning approval. You’ll also be required to get a separate NJDOT outdoor advertising permit for off-premise signs visible from highways. |
|
What Makes New Jersey Different
All signs within the Atlantic City Tourism District are regulated by the Casino Reinvestment Development Authority, not by the city alone. The signs that are not expressly approved are considered prohibited.
Statewide Rules
Uniform Construction Code (N.J.A.C. 5:23)
A sign in New Jersey is exempt from the state construction permit only if it is 25 square feet or less on one side. It must be no more than six feet above ground, must be ground-supported, and must not be served by an electrical circuit. This rule is enforced by the municipal Construction Code Office. Under this code, a building and electrical sub-code review may be required, in addition to local zoning sign permits.
NJDOT outdoor advertising (ODA ePermit)
You must get an NJDOT Outdoor Advertising permit for off-premise advertising signs that are visible from highways. This permit is filed through the state's ePermit system. A fee schedule comes attached. You’re not allowed to install an off-premise sign at locations that are not zoned as commercial or industrial. The signs cannot be located in the highway right-of-way.
The Typical Permit Process
- Confirm your local zoning. The local Zoning Officer will review your signage against the municipal sign ordinance regarding its type, area, height, setback, illumination, and projection.
- You must get a variance for signs that don’t conform. Under New Jersey’s Municipal Land Use Law, boards operate on statutory clocks (generally up to 45 days to deem an application complete and up to 120 days to decide, depending on the variance type), and public-notice requirements can add months.
- Get a construction permit under the UCC if your sign is non-exempt.
- File a separate NJDOT Outdoor Advertising permit for off-premise signs visible from roadways. You’ll need local approval before this.
- After installation, pass inspection. Some municipalities require an annual sign or advertising-structure license in addition to the one-time permit.
Notable Jurisdictions
Newark is the largest city in New Jersey. It applies a content-neutral sign ordinance, governed by the Division of Planning & Zoning. This city is notable for requiring an annual advertising-structure license. Temporary signs must have the date marked on them.
Jersey City issues sign permits through the Division of Zoning under Chapter 345. Internal or flashing illumination is strictly prohibited for commercial and storefront signs.
Atlantic City (CRDA Tourism District) is a distinctive district with a state-level overlay in effect. The Casino Reinvestment Development Authority regulates all signage within the Tourism District under the 2011 Tourism District Act. If a sign is not expressly permitted, it is automatically considered prohibited. Non-conforming signs need a variance.
Cape May is a National Historic Landmark city. Permanent signs require special approval from the Historic Preservation Commission and a certificate of appropriateness. Historic materials, natural tones, and minimal lighting are favored.
On Timelines
Timelines vary by jurisdiction. If your sign is conforming, which needs only a zoning permit plus a UCC construction permit, it will take only a few weeks in many towns. Signs requiring Zoning Board variances may take several months to obtain, given the statutory review clocks and notice periods under the Municipal Land Use Law. Signs needing both historic and CRDA review take the longest.
Sources
|
Commercial sign permitting in New Mexico is governed locally by city and county sign codes. The Night Sky Protection Act, a state-level layer, requires that most outdoor illuminated signs have shields and be downward-directed. The other state-level layer is NMDOT’s Outdoor Advertising program, which regulates off-premise billboards. In NM, there are large territories of tribal sovereign land. Signage follows tribal ordinance in these areas. |
|
What Makes New Mexico Different
A significant share of New Mexico land (commonly estimated at roughly one-tenth) is Pueblo and tribal sovereign land, and more than a dozen pueblos and tribes operate casinos and businesses on it. Here, the signage is governed by tribal land-use and gaming ordinances and tribal jurisdiction rather than municipal or county sign codes.
Statewide Rules
Night Sky Protection Act (NMSA 1978, 74-12)
The state enforces dark-sky laws under New Mexico's Night Sky Protection Act (NMSA 1978, Ch. 74, Art. 12). According to this law, lighting fixtures on most illuminated signs installed after January 1, 2000, must have shields and direct the light below the horizontal.
NMDOT Outdoor Advertising (NMSA 1978, 67-12; 18.21.5 NMAC)
NMDOT governs off-premise billboards along the Interstate, National Highway System, and primary highways under the Highway Beautification Act.
The Typical Permit Process
- Determine which jurisdiction your sign falls under.
- For on-premise signs, apply through the city's planning/zoning or community development department.
- Apply separately to NMDOT’s Outdoor Advertising program for off-premise billboards along controlled highways.
- Confirm Night Sky Protection Act compliance for any illuminated or externally lit sign.
Notable Jurisdictions
In Albuquerque, sign rules are in the Integrated Development Ordinance (IDO Section 14-16-5-12). Here, a licensed contractor must pull the permit. Freestanding signs over six feet need an engineered design issued by a licensed NM engineer, and over 12 feet need utility approval.
Las Cruces is Southern New Mexico’s largest metro. Sign permits are issued by Community Development under Land Development Code Chapter 36, filed through the city’s Accela Citizen Portal.
There are five historic districts in Santa Fe with strict design review. Restrictions are concerning sign area, color count, height, and projection. All illuminated signs require approval from the Historic Districts Review Board via a Historic Districts Application.
On Timelines
Timelines vary by jurisdiction and sign type. It takes a few days to get permits for simple, on-premise signs. For freestanding signs, you’ll need to provide engineered drawings, the review of which takes longer than in the case of on-premise simple signs. Signs in historic districts are subject to additional review, which adds more time to the permit process.
Sources
| Commercial signs are regulated locally by each municipality’s zoning, with construction safety governed by the state Uniform Code. This Code applies to every city in the state except New York City, which has its own Construction Codes and Zoning Resolution. |
|
What Makes New York Different
New York City has an entirely separate code from the rest of the state with its own requirements. Outside NYC, mid-size cities have their own regimes. New York state has numerous historic districts that often trigger a separate preservation design review.
Statewide Rules
Local zoning plus the state Uniform Code
Local zoning ordinances regulate signs. Construction safety is governed by the New York State Uniform Fire Prevention and Building Code (Appendix H, Signs) throughout New York State, except in New York City. The latter administers its own Construction Codes.
Highway outdoor advertising
Off-premise billboards along Interstate and primary highways are controlled by NYSDOT under Title 17 NYCRR Part 150. Special rules for parkways, scenic byways, and the Adirondack and Catskill Parks are in effect.
The Typical Permit Process
- Confirm the governing jurisdiction. The local zoning code controls what is allowed, while the building or permits department issues the permit.
- Verify zoning compliance, as several cities require a zoning sign-off or Certificate of Zoning Compliance before a building permit.
- Prepare a drawing set that includes a dimensioned elevation, a site plan or survey, attachment details, and electrical plans for illuminated signs.
- Submit to the local building office.
Notable Jurisdictions
New York City runs its own Construction Codes and Zoning Resolution through the Department of Buildings. You should file your drawings in DOB NOW (PW1) by a licensed PE or RA. If you have an illuminated sign, you’ll need a separate electrical permit plus an annually renewed and billed illuminated-sign permit. Zoning distinguishes accessory signs from advertising signs, and advertising signs are prohibited in residence districts and in many commercial districts, with additional restrictions near arterial highways and public parks. Check the Zoning Resolution for your specific district before planning any advertising sign.
Buffalo’s Unified Development Ordinance ('Green Code') sets daytime and nighttime luminance limits for electronic signs, with automatic dimming required. Confirm the current published values in the Green Code before ordering a digital display.
Rochester’s Zoning Code Chapter 120 requires a Certificate of Zoning Compliance before a building permit. Historic-district signs face added Preservation Board Review for materials, illumination, and compatibility.
Syracuse’s ReZone ordinance prohibits animated signs citywide. It requires a stamped Instrument Survey Map and scaled construction details.
On Timelines
Timelines vary widely and are not officially published for most New York jurisdictions. It usually takes a short time to get a permit for an ordinary non-illuminated sign. Signs requiring engineered drawings, a zoning sign-off, electrical permits, or historic design review can take several weeks to a few months to obtain. NYC historic-district reviews tend toward the longer end.
Sources
| Signs in North Carolina almost always need a local zoning or sign permit from the city or county. Permanent or illuminated signs require an additional building and electrical permit under the North Carolina State Building Code. |
|
What Makes North Carolina Different
Billboard signs along Interstate and federal-aid highways require an NCDOT outdoor advertising permit. Coastal counties require a CAMA layer on the signs.
There is an extra requirement for a Common Signage Plan in several NC cities in multi-tenant or multi-building sites.
Statewide Rules
NC State Building Code (the second permit)
You’ll need a building and electrical permit under the North Carolina State Building Code for permanent and illuminated signs. This permit is issued by the local inspections department, in addition to the local zoning sign permit. Illuminated signs must also meet the NC State Electrical Code.
NCDOT outdoor advertising
Outdoor advertising on Interstate, federal-aid primary, or National Highway System roads requires a separate NCDOT permit under G.S. 136-130 and 19A NCAC 2E. The permit is filed by the appropriate NCDOT district office.
The Typical Permit Process
- Confirm your zoning district and the allowed sign types.
- Check whether your sign is covered by a Common Signage Plan.
- Obtain a Certificate of Appropriateness and design-review approval for signs in a historic district and design-review overlay.
- Submit the local zoning/sign permit application with a site plan.
Notable Jurisdictions
In Charlotte, signs are governed by Unified Development Ordinance Article 22. You must get permits for all signs unless they’re expressly exempt. Permanent and illuminated signs need building and electrical permits. Historic districts apply Historic District Commission design guidelines.
Wilmington requires zoning permits for permanent and temporary signs. You have to obtain a Certificate of Appropriateness from the Historic Preservation Commission to install signs in local historic districts. Wilmington is a coastal city, and sign projects here can also fall under the CAMA layer.
Durham has strict requirements for the erection, movement, enlargement, and alteration of signs, which are governed by the Unified Development Ordinance and a sign permit.
On Timelines
Timelines vary from jurisdiction to jurisdiction. In Charlotte, for example, UDO directs the Planning Department to examine sign plans within 15 business days. If your sign requires a building or electrical permit, a Common Signage Plan, or a review for installation in historic sites, the timeline will take longer.
Sources
| Each city in North Dakota sets its own sign ordinance. Off-premise billboards along the interstate and primary highway systems require North Dakota DOT permits under the state’s outdoor advertising law (N.D.C.C. ch. 24-17). |
|
What Makes North Dakota Different
ND doesn’t prohibit billboards but strictly controls them along scenic corridors near Theodore Roosevelt National Park and the Badlands. Signs should also be engineered to withstand extreme cold and wind due to ND’s climate (high wind loads, ice, deep frost).
Statewide Rules
NDDOT outdoor advertising (N.D.C.C. ch. 24-17)
A North Dakota DOT permit under N.D.C.C. chapter 24-17 and the federal Highway Beautification Act is required for off-premise billboards along interstate and primary highways.
The Typical Permit Process
- Determine whether the sign is on-premise. If yes, identify the city and zoning district and apply through the local building/permitting or planning department.
- Submit a scaled drawing that shows dimensions, height, setback, area, and illumination.
- Get an electrical permit for illuminated or electronic signs.
Notable Jurisdictions
Fargo is the state’s largest city where sign permits run through inspections. Signs are regulated by the Land Development Code (Article 20-09). Permits are required to erect or alter most signs. Separate rules apply to electronic message centers.
Bismarck is the state’s capital, where sign permits are issued by the Building Inspections Division under the zoning ordinance. The allowances are tied to the zoning district, and separate provisions apply to freestanding, wall, and electronic signs.
Minot runs sign permits through its permitting office under the zoning ordinance.
On Timelines
Timelines vary city by city and sign type. You can get a permit for a conforming on-premise sign in a few business days or a couple of weeks. Signs that require a variance or site-plan review, or that are located in a scenic corridor, take longer to be approved.
Sources
| On-premise signs are governed by local cities and counties. Statewide structural, wind-load, and electrical standards are in effect under the Ohio Building Code’s Appendix H. ODOT’s outdoor-advertising program under Revised Code Chapter 5516 regulates billboards near highways. |
|
What Makes Ohio Different
For installing large wall signs, you must get a permit to ensure they’re designed to sustain wind loads. Illuminated signs must comply with NFPA 70.
Statewide Rules
ODOT outdoor advertising (ORC Chapter 5516)
Off-premise billboard signs within 660 feet of interstate and primary-system highway require an ODOT permit under Revised Code Chapter 5516. You can install these signs only in areas zoned and designated as commercial or industrial, and state rules cap sign-face size (currently up to 1,200 square feet; confirm current limits with ODOT).
The Typical Permit Process
- Confirm the sign rules with your specific zoning district.
- Prepare the application package, including the permit form, scaled drawings showing dimensions and materials, and a site plan.
- If you have an illuminated or structurally mounted sign, you must also include electrical and structural/wind-load information.
Notable Jurisdictions
Columbus regulates signs under its “Graphics Code”. “Graphics permits” are issued through its Department of Building and Zoning Services. Variances and special permits are granted by the Graphics Commission if you provide a hardship. You’ll also need a review from the Historic Resources Commission for historic areas, such as German Village and the Short North.
In Cleveland, sign regulations are in the Zoning Code (Chapter 350). They are administered by the Department of Building and Housing. In design review and landmark districts, such as Ohio City and Tremont, a permit must be obtained for even repainting or a sign face replacement.
Cincinnati codifies its sign rules in the Zoning Code, Chapter 1427. Applications are filed at the Permit Center. Signs in historic districts should have a certificate of appropriateness from the Historic Conservation Board.
On Timelines
Timelines vary by jurisdiction. It’s fast to get permits for on-premise signs in commercial zones. More time is needed for signs in historic areas that need extra review. You’ll need a variance for nonconforming signs, which will add time to the final approval process.
Sources
| The sign control rules in Oklahoma are governed by local cities’ zoning/sign code. Billboards are administered by ODOT, which is a state-level program. Tall signs must be specially engineered to withstand tornado-alley wind exposure. |
|
What Makes Oklahoma Different
Oklahoma is home to big metropolitan areas and historic overlays with specific sign codes, including Tulsa’s Route 66 Overlay and Bricktown, Downtown, and Scenic River design districts. There are certain restrictions on neon-style signage in these areas. Signs in some of these areas must also undergo a design review and obtain a Certificate of Approval/Appropriateness.
Statewide Rules
ODOT outdoor advertising (OAC 730:35, Title 69)
Off-premise billboards visible from an interstate or federal-aid primary highway must be registered and permitted by ODOT. The notarized AP-100 application is used for this program, which requires a $100 initial fee per sign, with a $20 renewal fee per permit. Confirm the current renewal cycle and processing times directly with ODOT.
The Typical Permit Process
- Determine which jurisdiction governs the site and confirm the zoning district.
- Check whether the property is situated in a historic district to get a special certificate of appropriateness.
- Submit the application along with the site plan that includes property lines, setbacks, and detailed sign drawings.
Notable Jurisdictions
Oklahoma City is the largest city in the state, where sign rules are set forth in Municipal Code Chapter 3 and Article XVI of the zoning chapter. You should apply through Development Services using the city’s commercial sign checklist.
Tulsa is the second largest city where signs are governed by Chapter 60 of the Tulsa Zoning Code. You need permits for all signs unless they have been expressly exempted.
Edmond enforces limitations on temporary signs. Businesses may purchase up to 8 temporary sign permits per year. Flashing, moving, or scrolling signs and pennants are prohibited.
On Timelines
Timelines depend on the jurisdiction and the type of signage. Simple on-premise signs are approved faster, while signs in historic areas that require design reviews take longer.
Sources
| Commercial sign permitting is governed locally in this state. The Oregon Structural Specialty Code determines the structural and engineering requirements for signs. ODOT’s Outdoor Advertising program under the Oregon Motorist Information Act regulates highway-visible off-premise signs. |
|
What Makes Oregon Different
In Oregon, new off-premise billboard permits are generally unavailable. Existing pre-2007 permits can be relocated, reconstructed, or sold.
Freestanding and projecting signs need structural calculations stamped by an Oregon-licensed engineer under the statewide Oregon Structural Specialty Code.
Statewide Rules
Oregon Structural Specialty Code (OSSC)
The statewide Oregon Structural Specialty Code regulates the structural, wind, and seismic engineering for signs. For freestanding and non-flush-mounted signs, you need to provide specific calculations that are stamped by an Oregon-licensed engineer.
The Typical Permit Process
- Determine the jurisdiction and zone and find out whether the installation area is incorporated or not.
- Check the state ODOT layer if the sign is off-premise.
- Prepare and submit engineered drawings along with your application.
- Submit the local sign/building permit application with a site plan, attached details, and an electrical permit if your sign is illuminated.
- Pay fees, which are commonly based on sign square footage.
Notable Jurisdictions
Portland is the largest metro in the state with the sign code under Title 32, administered by Permitting & Development Services. You must obtain Oregon-licensed engineered calculations for freestanding and non-flush signs to meet the OSSC. You can get a free pre-application planner consult for signs in design overlays, historic districts, and historic resources. This applies to signs that fall outside by-right standards and need land-use review.
Eugene Code Chapter 9 regulates the sign standards, except for addresses, building directories, and small election signs. You must submit your application through the eBuild portal. The city states signs are reviewed within about two weeks.
Bend Code Chapter 9.50 regulates signs. The applications run through the Online Permit Center. Area calculation rules are in effect. In this city, you must comply with dark-sky limitation rules. The signs’ lighting should point downward, while in Deschutes County, the signage fixtures must be fully shielded.
Cannon Beach is a north-coast city whose sign regulations are set forth in the Municipal Code. Here, there are stricter regulations on sign structures and exterior lighting controls, taking into account the region’s coastal character.
On Timelines
Timelines vary by jurisdiction. Simple, code-compliant signs are approved within two weeks. If you need to add structural engineering, electrical permits, or freestanding footings, expect extended timelines.
Sources
| In Pennsylvania, zoning approval is at the local level. The building and structural permits are issued under the statewide Uniform Construction Code. Signs along interstate highways require a separate PennDOT permit. |
|
What Makes Pennsylvania Different
In Pennsylvania, you must obtain an outdoor advertising permit annually under 67 PA Code Chapter 445. This is effective for signs visible from interstate and federal aid primary highways.
Statewide Rules
Uniform Construction Code (UCC)
The structural sign permit is issued by the local code office in most municipalities. However, in “opt-out” towns, the state L&I Building Section issues it instead. This means that the same sign can be approved by the city in one town and by the state in another.
The Typical Permit Process
- Determine whether you need a local zoning permit, a UCC building or structural permit, or an electrical permit.
- Confirm who administers the UCC for the municipality. This is administered locally in most towns, or the state L&I Buildings Section in opt-out municipalities.
- Submit the zoning application with a scaled site plan and dimensional sign drawings.
Notable Jurisdictions
In Philadelphia, the Department of Licenses & Inspections handles both zoning and building permits. The applications are submitted online through eCLIPSE. You’ll need to obtain a zoning permit for permanent signs. It will take around 20 business days for standard plan reviews. Paying an extra fee can shorten that to about five business days.
OneStopPGH portal issues sign permits in Pittsburgh. Parts of the city are subject to historic preservation review. You’ll need a Certificate of Appropriateness from the Historic Review Commission. Submissions are due at least 13 business days before the HRC hearing.
Erie requires building permits preceded by zoning approval. Commercial districts carry different sign allowances.
On Timelines
Timelines vary by municipality. For example, Philadelphia publishes about 20 business days for standard sign plan review. You can accelerate the time period by paying extra and get the review within five business days. Pittsburgh’s Historic Review Commission requires submission at least 13 business days before its hearing.
Sources
| Rhode Island has banned new off-premise billboard permitting. On-premise commercial signs are permitted under each city or town's zoning ordinance. In historic districts, signs must undergo a review as part of a common sign permit. |
|
What Makes Rhode Island Different
Under current state policy, Rhode Island does not issue permits for new off-premise outdoor advertising billboards. This is the smallest and one of the most densely settled states. It has an outsized concentration of local historic districts, including those in Providence and Newport. A historic district commission design review applies to commercial signs.
Statewide Rules
No new billboards
RIDOT does not issue permits for new off-premise outdoor advertising structures. The inventory is limited to existing, previously permitted signs.
The Typical Permit Process
- Confirm your sign is on-premise, since new off-premise billboards aren't permitted.
- Identify your city or town and zoning district.
- You can apply for the sign permit through the municipal building/zoning office.
- Provide drawings showing your sign’s dimensions, height, and illumination, if any.
Notable Jurisdictions
Providence is the state capital and largest city. The sign regulations are set forth in its Zoning Ordinance and are permitted by Inspections and Standards. In historic districts, the Historic District Commission must approve your sign design.
Newport is a historic seaport where Historic District Commission review is required for sign permitting.
Warwick is the second-largest city in which sign permits are issued through the Building Department under the zoning ordinance.
RIDOT is the state highway authority, which doesn’t permit new off-premise billboards.
On Timelines
Timelines are different from jurisdiction to jurisdiction. If you have conforming on-premise signs, they may only need an administrative review to get approved. This might take from several days to a couple of weeks. The most common delays happen for signs in historic areas. Historic District Commissions meet monthly, so build that cycle into your timeline.
Sources
| On-premise business signs in this state are governed almost entirely at the city or county level. All signs must undergo a structural review under the South Carolina Building Code. SCDOT controls off-premise billboards along interstates and federal-aid primary highways under the Highway Advertising Control Act. |
|
What Makes South Carolina Different
South Carolina pioneered historic district regulation. Charleston adopted the nation's first historic-preservation zoning ordinance in 1931 and created the first Board of Architectural Review. Signs near coastal areas must be specifically designed to withstand hurricanes. This is especially important for freestanding and large signs. The SC Building Code requires signs to be designed for wind pressure in accordance with IBC Chapter 16.
Statewide Rules
South Carolina Building Code (wind loads)
This code regulates sign construction, including wind and structural requirements, under Chapter 16 and the sign-specific provisions in Appendix H.
SCDOT outdoor advertising (Title 57, Ch. 25)
You’ll need to obtain permission from SCDOT for off-premise billboards along interstates and federal-aid primary highways. Along those routes, a sign face can't exceed 672 square feet, 60 feet in length, or 48 feet in height.
The Typical Permit Process
- Determine whether your sign is on-premise or off-premise. The on-premise signs go through the local city/county zoning office. Off-premise billboards also need an SCDOT permit.
- Confirm the property’s zoning district and any overlay, if any.
- Submit a local sign permit application. Don’t forget to include a scaled drawing, site/elevation plan, dimensions, and illumination details.
Notable Jurisdictions
Charleston is home to the nation’s first historic-preservation zoning ordinance and the first Board of Architectural Review. Signs under BAR jurisdiction require BAR review. The historic context favors externally lit, restrained, often projecting signs over large internally illuminated boxes.
Columbia/Richland County is the state capital. City sign rules are set forth in the Unified Development Ordinance, which also covers historic preservation and overlays.
Hilton Head Island is a master-planned coastal town with sign standards in the Land Management Ordinance. There are restrictions on size, height, illumination, and off-premise signage to preserve its wooded character.
On Timelines
Timelines vary by jurisdiction and sign type. You will get a permit for on-premise signs in a few business days to a few weeks. Signs in historic or design overlays take longer because they need board or staff review on a meeting cycle.
Sources
| All on-premise commercial signs are at the local level, with each city having its own sign ordinance. Off-premise billboards near interstate and primary highway systems need a South Dakota DOT permit under the state’s outdoor-advertising law (SDCL ch. 31-29). |
|
What Makes South Dakota Different
This state doesn’t ban billboards, but strict restrictions are applied to Deadwood. This city is entirely a National Historic Landmark. Signage here must run through Historic Preservation Commission design review.
Statewide Rules
SDDOT outdoor advertising (SDCL ch. 31-29)
You’ll need to have a South Dakota DOT permit under SDCL chapter 31-29 and the federal Highway Beautification Act for installing off-premise billboards along the interstate and primary highway systems.
The Typical Permit Process
- Determine whether your signage is on-premise or off-premise. For on-premise signs, you should turn to local authorities. For off-premise billboards, you must also get an SDDOT permit.
- Submit scaled drawings with dimensions, height, copy area, setback, and illumination.
- If you’re situated in Sioux Falls, submit your application with Building Services under the zoning ordinance.
- In Rapid City, you can apply through Community Development.
- Deadwood requires approval of the sign design by the Historic Preservation Commission before the permit is issued.
- Confirm local zoning ordinance, then apply to SDDOT for an outdoor advertising permit for a billboard.
Notable Jurisdictions
Sioux Falls is the state’s largest city where sign permits are governed by Building Services under the zoning ordinance. There are size and height limits, and separate provisions apply to freestanding, wall, and electronic message-center signs, which are defined by districts.
Rapid City is the gateway to the Black Hills and Mount Rushmore. Sign permits are regulated by Community Development. For signs in tourism corridors, you’ll need district allowances and scenic considerations.
The entire city of Deadwood is a National Historic Landmark. Here, the sign design requires review by the Historic Preservation Commission to maintain the 1876 Gold Rush streetscape.
Aberdeen is a northeastern regional hub where sign permits are administered by the city’s building permitting office under the zoning ordinance.
On Timelines
Timelines vary by city and sign type. An on-premise sign takes a short time to review, generally days to a couple of weeks. The time is extended for sign permits requiring review by Deadwood’s Historic Preservation Commission and for off-premise billboards along interstate highways requiring an SDDOT outdoor advertising permit.
Sources
| On-premise signs are regulated locally in this state. Billboards within 660 feet of interstate and primary highways require an off-premise outdoor advertising review issued by TDOT, in addition to the regular sign permit. |
|
What Makes Tennessee Different
There are differences between the four big metropolitan areas in this state in terms of substance and mechanics. Nashville, for example, files by email to Metro Codes. Memphis runs a city/county joint construction Code Enforcement office under a Unified Development Code. Knoxville mandates a city-licensed electrician for illuminated signs. Chattanooga uses an OpenGov portal with a Board of Sign Appeals.
Tourism corridors like Sevierville, Gatlinburg, and Pigeon Forge have set strict controls to keep the areas’ overall aesthetics.
Statewide Rules
TDOT outdoor advertising
TDOT’s Outdoor Advertising Control Program regulates billboards and off-premise outdoor advertising within 660 feet of interstate or primary highways under the Billboard Regulation and Control Act (TCA Title 54, Ch. 21).
The permits must be renewed annually. There is a strict maximum limit on the total surface area of the sign face. It’s also required that the digital changeable-message displays hold a static message for a minimum interval. Animation and scrolling are prohibited.
The Typical Permit Process
- Confirm the property’s zoning district and any overlay.
- Prepare the application package including the sign/building permit application, a site plan, and scaled renderings with dimensions, materials, and illumination details.
- Submit to the local permitting authority.
- Install and pass inspections. Ground or monument signs generally require footing and final inspections. Illuminated signs require an electrical inspection.
Notable Jurisdictions
Nashville / Davidson County is a consolidated metro government. Here, signs require zoning, building, and other permits. You should apply through Metro Codes & Building Safety by email. There are two additional layers on top of the regular permit: the Downtown Code with street-type-based sign standards and Metro Historic Zoning Commission overlays that require a preservation-permit design review.
Memphis / Shelby County issues permits through the joint Memphis and Shelby County Office of Construction Code Enforcement under the Unified Development Code. Applications need zoning, structural, and electrical review.
Knoxville requires a permit for all signs under the city zoning ordinance. It’s handled by Plans Review & Inspections. For illuminated signs, you’ll need a separate electrical permit and a City of Knoxville-licensed electrician to install the sign.
Chattanooga files sign permits through the city's OpenGov online portal. If your sign is non-conforming and you need to get a variance, you should turn to the Board of Sign Appeals. Signs in the public right-of-way need a Temporary Use Permit from the Division of Transportation.
On Timelines
Timelines are jurisdiction-dependent. Fully compliant on-premise signage requires little time to obtain a permit. Signs that need a variance or design review take more time, varying from weeks to months.
Sources
| Permitting in Texas is handled by home-rule cities and counties, meaning the same sign can be approved in one Texas city and prohibited in the next. TxDOT issues licenses for off-premise billboards along regulated highways. Signs situated in coastal catastrophe counties must meet windstorm construction standards. |
|
What Makes Texas Different
Each city, historic or downtown overlay in Texas has its own on-premise sign code. Houston has no traditional zoning. Its Sign Code does much of the regulating.
Fourteen counties along the Gulf are designated catastrophe areas by the Texas Department of Insurance: Aransas, Brazoria, Calhoun, Cameron, Chambers, Galveston, Jefferson, Kenedy, Kleberg, Matagorda, Nueces, Refugio, San Patricio, and Willacy, plus parts of Harris County east of Highway 146.
Structures in these areas require a WPI-8 certificate of compliance, which makes them eligible for windstorm and hail coverage through the state's insurance association. Without it, a structure is generally ineligible for windstorm and hail coverage through TWIA (the state's insurer of last resort), though private coverage options vary.
Statewide Rules
TxDOT billboard permits (off-premise)
Off-premise outdoor advertising along interstate, primary, and rural highways is licensed and permitted by TxDOT under Transportation Code Chapters 391 and 394, through the CSLAP system.
Coastal windstorm certification (WPI-8)
In the 14 designated catastrophe counties, structures must meet windstorm construction standards and obtain a WPI-8 certificate of compliance. This is administered by the Texas Department of Insurance and is the practical enforcement mechanism for windstorm building standards in a state with no statewide building code.
The Typical Permit Process
- Confirm zoning and obtain a current Certificate of Occupancy.
- Determine the sign district or overlay, if any.
- You need to engage a licensed or registered sign contractor where required.
- Prepare construction and sign drawings.
- For illuminated signs, get a separate electrical permit.
- Pass final inspection. City sign permits are time-limited.
Notable Jurisdictions
Houston Sign Administration administers the Sign Code. You should submit your application through ProjectDox. This city has no traditional zoning, and the regulations are mostly administered by the Sign Code. Permits are generally issued to licensed sign contractors.
In Dallas, a Certificate of Occupancy in the correct tenant name must be on file before a sign permit can be approved. The city also limits attached signage to eight words, each over four inches tall, per facade, per occupant, counting all signs together, new and existing. Taglines and secondary copy that clear everywhere else can fail in Dallas on word count alone. When everything is in order, the city says permits typically take around two business days.
San Antonio regulates signs by Chapter 28 of the City Code. Signs meet strict rules in historic districts under the Unified Development Code. In these areas, pole signs and billboards are prohibited. Exterior signs require a Certificate of Appropriateness from the Office of Historic Preservation.
Galveston sits in both a historic district and a coastal catastrophe county, so it stacks two layers. Most signs require a permit under the Land Development Regulations; historic district signs go before the Landmark Commission; and sign structures require WPI-8 certification for windstorm insurance eligibility.
On Timelines
Timelines vary by jurisdiction. Dallas says permits typically take around two business days. Permits for coastal windstorm inspection and illuminated signs extend time.
Sources
| In Utah, on-premise signs permitting is regulated by local city or county zoning. The statewide layers are the State Construction Code (for the structural and electrical side of signs) and UDOT's Outdoor Advertising Control program for off-premise billboards on state routes. Several resort towns constrain sign illumination due to their dark-sky culture. |
|
What Makes Utah Different
Utah has many dark-sky communities and ordinances. They limit sign illumination, brightness, color temperature, and shielding in scenic and resort towns.
Statewide Rules
State Construction Code (structural/electrical)
Signs’ structural and electrical aspects follow Utah’s adopted State Construction Code (the International Codes). Freestanding and large signs in most of the populous Wasatch Front need an engineered structural review, as the area is in a high seismic design category and faces wind and snow loads. Confirm the currently adopted code edition with the local jurisdiction.
UDOT Outdoor Advertising (Utah Code 72-7-5)
Off-premise billboards along state routes require a separate permit from UDOT’s Outdoor Advertising Control program under the Utah Outdoor Advertising Act. There is a non-refundable application fee of $950. Billboards may only be erected in areas zoned commercial or industrial. This is in addition to any local approval.
The Typical Permit Process
- Determine the sign type and the property’s zoning district.
- Apply for a sign permit with the city's planning or building department. Submit a scaled, dimensioned site plan and an elevation drawing.
- Pay the sign permit fee plus any separate plan-check fee.
- Obtain an electrical permit for illuminated signs and a building or structural permit for larger freestanding signs, which triggers IBC wind and seismic review.
- If the sign overhangs public property, obtain separate city approval and a certificate of insurance.
- Multi-tenant projects require an approved Master Sign Plan before any individual sign permit is issued.
- Route the sign through design review in historic or scenic overlays. For off-premise billboards on state routes, apply separately to UDOT.
Notable Jurisdictions
Salt Lake City regulates the signs in its Zoning Code Chapter 21A.46. A scaled site plan and elevation drawing are required for applications. If the sign is overhanging public property, then you’ll be required to obtain city property-manager approval plus a certificate of insurance.
Park City is a resort town with the Sign Code under Title 12. Here, multi-tenant buildings must file a Master Sign Plan before any sign permit. You are not allowed to use synthetic or fluorescent colors. The historic Main Street signs go through Historic District design review.
In Provo, signs are governed by City Code Chapter 14.38. If the sign is not expressly allowed in a zone, it is considered prohibited. Electronic Message Centers are allowed only in certain commercial/manufacturing zones and prohibited in residential zones.
The sign illumination is constrained in scenic and resort communities by outdoor lighting ordinances. Springdale, which is a Dark Sky International community at the gateway to Zion, requires downward-facing, shielded fixtures. Others limit the brightness and color temperature, thereby restricting illuminated and internally lit signage well beyond typical city sign codes.
On Timelines
Timelines vary by jurisdiction and sign type. Simple conforming, non-illuminated wall signs can be permitted over-the-counter or in a few business days. Illuminated signs and larger freestanding signs that trigger IBC wind and seismic review typically run multiple weeks of plan check.
Historic districts, dark-sky towns, and Master Sign Plan or Planning Commission review add weeks. Off-premise billboards that need a UDOT permit plus local approval extend the timeline. Please confirm with a specific city.
Sources
| In Vermont, all off-premise billboards are banned. The state runs an official business directional sign program through the Travel Information Council. The roadside business visibility is standardized and state-administered. |
|
What Makes Vermont Different
Vermont eliminated off-premise billboards statewide. Off-premise signs aren't allowed unless the Travel Information Council grants an exemption, and those are typically limited to public safety and convenience cases.
Vermont also sets hard statewide limits on on-premise signs, in addition to local zoning. Under 10 V.S.A. § 493, a sign can't exceed 150 square feet in area, can't stand more than 25 feet above ground, and can't sit more than 1,500 feet from the main entrance to your business. One important exception: the 150-square-foot cap doesn't apply to signs attached to or part of the building itself, so a wall sign on your own storefront isn't limited the same way a freestanding sign is.
Large developments can also trigger Act 250 review, Vermont's statewide land-use permitting process for bigger projects.
Statewide Rules
Statewide billboard ban + TIC directional signs (10 V.S.A. ch. 21)
Vermont’s Outdoor Advertising Law prohibits off-premise billboards, so the roadside business visibility is provided only through the Travel Information Council’s Official Business Directional Sign and interstate Logo programs.
On-premise signs are generally limited to 150 square feet, 25 feet in height, and 1,500 feet from the main entrance, unless the sign is attached to the building.
The Typical Permit Process
- Plan only on-premise signs, and check them against the statewide caps: 150 square feet, 25 feet tall, within 1,500 feet of your main entrance.
- Apply through the municipal zoning administrator under the town’s bylaws.
- Submit scaled drawings showing dimensions, height, setback, copy area, and illumination.
- Pull an electrical permit for illuminated signs.
Notable Jurisdictions
Burlington is the state’s largest city, where sign permits are issued through Permitting & Inspections under the Comprehensive Development Ordinance (Article 7). Signs in downtown and historic districts must also be reviewed by the Design Review Board with certain limits on size and illumination.
Montpelier is a small state capital where the historic downtown is subject to design-conscious sign rules under the city's zoning regulations, administered through the Planning & Community Development office.
Rutland is a regional commercial center where sign permits run through the city zoning office under the local zoning ordinance. There is the statewide 150-square-foot cap on on-premise signs.
On Timelines
Timelines vary by town and sign type. If your sign is a conforming on-premises sign, for example, in a small Vermont town, it’ll be quick to pass the zoning administrator's review, taking only a couple of days to a couple of weeks. Signs needing design reviews in places like Burlington’s downtown or historic districts add additional time.
The same applies to those triggering Act 250 land-use review. Roadside directional and logo signage is managed by the Travel Information Council on its own track. Confirm with the municipal zoning office.
Sources
| Commercial sign permitting in Virginia needs to follow two tracks. First, signs must pass a local zoning approval and a building or electrical permit. The zoning approval is governed under each city’s or county’s own sign ordinance, while the building or electrical permit is under the Virginia Uniform Statewide Building Code. |
|
What Makes Virginia Different
The Uniform Statewide Building Code applies the same Appendix H sign rules and exemptions everywhere. Localities are prohibited from imposing stricter construction or material standards.
Fairfax County states that its sign permit also serves as the building and electrical permit, meaning that separate permits are not needed. Historic overlays add a Certificate of Appropriateness.
Statewide Rules
Uniform Statewide Building Code (USBC)
The construction and electrical rules for a sign are uniform across Virginia under the USBC and its Appendix H. This is enforced by each locality’s building department. Appendix H exempts certain signs (painted non-illuminated signs and small projecting signs) from the building permit requirement and requires illuminated signs to be wired in accordance with NFPA 70.
The Typical Permit Process
- Confirm zoning and verify whether there are any overlays on top of your ordinary sign permit.
- Apply for the sign permit with the local zoning or planning office, typically through an online portal. Some of these portals are Fairfax County PLUS, Norfolk E-Permit, and Virginia Beach Accela.
- Submit the sign rendering and, if it’s freestanding, also include a site plan and engineered drawings where applicable.
Notable Jurisdictions
Virginia Beach is the largest in the state. Here, sign permits are reviewed by the Zoning Administration through the Accela Citizen Access portal. The decisions are made within 30 days of a complete application.
Richmond is the state capital, with pervasive Old and Historic Districts. If you want to make any changes to signs, you should obtain a Certificate of Appropriateness from the Commission of Architectural Review, which will be reviewed against the Secretary of the Interior's Standards and the city's design guidelines.
Norfolk is a major Hampton Roads city where you can apply for building, sign, electrical, and zoning permits all through the city’s E-Permit Portal. The applications should conform to the zoning ordinance, city regulations, and the Statewide Building Code. Some signs may require a Conditional Use Permit.
Alexandria is home to Old and Historic Alexandria and the Parker-Gray district. It is regulated by a Board of Architectural Review. You are required to pass BAR approval (or administrative staff approval for minor signage) via a Certificate of Appropriateness. The BAR meets twice monthly, with applications due at least 30 days before the hearing.
On Timelines
Timelines may vary by jurisdiction. Sign permits that need only a zoning permit can be relatively quick. Fairfax County cites about 14 calendar days absent added requests. Virginia Beach states that decisions are made within 30 days after the application is completed. Historic-district signs take longer because a Certificate of Appropriateness is tied to a board's hearing cycle (Alexandria requires applications at least 30 days before the meeting). Minor signs may qualify for faster staff approval. Confirm with the local office.
Sources
| Sign permitting is governed almost entirely by local zoning in Washington. The electrical design of illuminated signs is regulated by the state Department of Labor and Industries, except in cities that have their own electrical inspection. |
|
What Makes Washington Different
This state splits sign and electrical permitting. The first is local, while the second pulls in the state L&I electrical-licensing regime, except in several large cities (Seattle, Tacoma, Spokane).
Billboards are notably restricted in the state’s largest cities. You’ll need to add a design or historic-review certificate for signs in downtown or historic areas.
Statewide Rules
Local sign permit plus L&I electrical
The ordinary sign permit is local, while permitting for illuminated signs is not. It drops into Washington's strict electrical consumer-protection laws. Some cities have their own electrical permits and inspections.
The Typical Permit Process
- Confirm the property’s zoning and the sign code chapter it applies to.
- Determine whether you need to introduce any additional reviews, such as a design review or a historic certificate of approval.
- Submit through the jurisdiction’s portal.
- Pass plan review, including any engineered drawings required for larger or taller freestanding structures.
- If you own an illuminated sign, make sure to include the electrical information so that an electrical permit can be issued, and use a licensed electrical contractor.
- Check whether you need to schedule inspections.
Notable Jurisdictions
In Seattle, signs over 5 sq ft or any electrically powered sign require a permit under Land Use Code Ch. 23.55. The applications are submitted through the Seattle Services Portal. Historic and special-review districts (Pioneer Square, Pike Place Market) require a Certificate of Approval first. SDCI runs its own electrical permitting.
Spokane Municipal Code Ch. 17C.24 regulates signs. According to the city’s application, a licensed engineer must seal larger or taller signs. You’ll need a separate electrical permit for illuminated signs. The city also bans new off-premise billboards.
Tacoma regulates signs through Tacoma Municipal Code 13.06.520. You can apply through Tacoma’s online permit system, including a site plan, elevations, and an inventory of existing signs. Variances generally take about 60 days to complete plus a two-week appeal period. Tacoma runs its own electrical permitting.
Vancouver regulates signs under Vancouver Municipal Code Ch. 20.960. You’re prohibited from erecting, enlarging, moving, or converting a sign without a permit from the Planning Official. Reader-board copy changes and routine maintenance are exempt from this process. Permits become void if work is not started within 180 days.
On Timelines
Timelines vary by jurisdiction. In Seattle, conforming, on-premise sign approval can be issued in about a week. In other cities where design review or a historic certificate of approval is required, the time extends.
Sources
| On-premise commercial sign permitting is governed at the city or county level. The WV Division of Highways runs an outdoor-advertising control program under WV Code Chapter 17, Article 22 under the federal Highway Beautification Act. |
|
What Makes WV Different
Much of this state is rural and unzoned, meaning the controlling authority for a sign genuinely varies by address. The first step is confirming whether a city, a county, or no local authority regulates the sign.
The WVDOH program enforces the federal 660-foot control zone through annual permits.
Statewide Rules
WVDOH outdoor advertising (WV Code Art. 17-22; CSR 157-6)
WV Division of Highways controls off-premise billboards that are within 660 feet of, and visible from, federal-aid interstate and primary highways under the WV Code Article 17-22 and CSR Series 157-6. This program implements the federal Highways Beautification Act. Permits require a property owner consent affidavit and are renewed annually. A WVDOH permit does not override a more restrictive local ordinance.
Statutory proximity buffer
WV Code 17-22-4 bars advertising signs outside municipalities within 500 feet of churches, schools, cemeteries, public parks, or state/national forests.
The Typical Permit Process
- Identify jurisdictions by address, as much part of this state is unzoned or rural.
- For an on-premise sign inside a city, apply to the city building/permit department.
- Along with a written application, also submit drawings showing the sign’s size, dimensions, design, mounting, and location.
- Verify zoning compliance regarding the sign's size, height, type, etc.
- Pay the local fee and pass any required inspection.
Notable Jurisdictions
Charleston is the capital of the state where the Building Department issues sign permits. Signs are governed by the Zoning Ordinance. Fees are based on square foot with different rates for non-electrified versus internally and externally illuminated signs. You should confirm the current schedule with the Building Department.
Wheeling includes multiple historic design-review districts. The North Wheeling Historic District (Victorian Old Town) ordinance requires design review by the Historic Landmarks Commission for exterior changes.
WV Division of Highways administers off-premise outdoor-advertising control under WV Code Art. 17-22 and CSR 157-6, within 660 feet of and visible from federal-aid interstate and primary highways. Permits require an owner consent affidavit and are renewed annually. A state permit doesn't supersede stricter local rules.
On Timelines
Permitting for an on-premise sign is in a short timeframe. It may take longer for signs that require an extra review, such as those in historic districts.
Sources
| Commercial sign permitting in Wisconsin is overwhelmingly local. Each sign approval is subject to the zoning ordinance. The structural and electrical permitting is tied to the statewide Wisconsin Commercial Building Code. |
|
What Makes Wisconsin Different
Most storefront signs skip the state permit entirely, but only if they advertise the business they're actually attached to, sit on that business’s own property, and stay out of the highway right-of-way.
Statewide Rules
Wisconsin Commercial Building Code (SPS 361-366)
The structural and electrical construction of larger and illuminated signs is governed by the statewide Wisconsin Commercial Building Code (Wis. Admin. Code chs. SPS 361-366), enforced locally. When state and local rules disagree, follow the stricter one.
WisDOT outdoor advertising (Wis. Stat. 84.30/84.305)
If your sign is a billboard visible from an interstate or a federal-aid primary highway, you'll need a separate permit from WisDOT under Wis. Stat. 84.30 and 84.305, on top of whatever your city already requires.
The Typical Permit Process
- Determine your sign type by whether it’s on-premise or off-premise. The latter, near interstate or federal-aid highways, also needs a WisDOT permit.
- Confirm the local zoning district and sign rules.
- Check whether you need a special review for your sign (e.g., a historic or design review).
- Pass plan review. Larger, electric, or freestanding signs require a structural and electrical review under the Commercial Building Code.
- Install and pass inspection.
Notable Jurisdictions
In Milwaukee, sign regulations are part of the city Zoning Code, Chapter 295. The Department of Neighborhood Services reviews and issues permits. If your sign is in designated historic districts or on historic buildings, you’re required to undergo additional Historic Preservation Commission review.
Madison governs signs under Chapter 31, the Sign Control Ordinance, administered through the Development Services Center. It’s cited that the standard review takes about two to three weeks. Madison layers in eight Urban Design Districts; the Urban Design Commission has authority over sign exceptions and Comprehensive Design Reviews. Applicants are limited to licensed contractors, owners, or authorized tenants.
In Kenosha, signs are regulated under the city sign ordinance. Signs must be wholly on private property. They must not obstruct motorist visibility. New off-premises billboard signs are prohibited.
On Timelines
Timelines vary by jurisdiction. Madison's own guidance cites two to three weeks for a standard sign review. Milwaukee historic-district signs run several weeks or more. Please confirm with the specific city.
Sources
| Commercial on-premise signs are handled locally, with each city or county setting its own rules. Off-premise signs along the interstate or federal-aid primary systems need an additional Wyoming DOT permit under the state’s outdoor-advertising law. |
|
What Makes Wyoming Different
Dark-sky and scenic protection is in effect in Teton County / Jackson. Rules are set to preserve night skies and mountain viewsheds. Illuminated and internally lit signs are sharply limited near Grand Teton and the Yellowstone gateway.
Depending on the extreme weather of this state, freestanding signs along corridors like I-80 are required to have special footing and structural design.
Statewide Rules
WYDOT outdoor advertising
Off-premise billboards along interstate and federal-aid primary systems require an extra Wyoming DOT permit under the state’s outdoor advertising statutes and the federal Highway Beautification Act. Scenic corridor restrictions apply near national parks and gateway routes.
The Typical Permit Process
- Determine whether the sign is on- or off-premise.
- If it’s on-premise, then identify the city or county and zoning district to apply through the local building or planning office.
- Submit scaled drawings showing dimensions, height, copy area, setback, and illumination for your sign.
Notable Jurisdictions
Cheyenne is the state capital and the largest city, with a sign permit issued through Planning and Development under the Unified Development Code. There are district-based size and height limitations and separate provisions for freestanding, wall, and electronic message-center signs, so check before installing one.
Casper is a central Wyoming energy hub. Here, sign permits are administered through Community Development under the zoning ordinance. The allowances are tied to zoning district and high-wind structural requirements for freestanding signs.
Jackson / Teton County includes the Grand Teton and Yellowstone gateway. Sign and lighting rules emphasize dark sky and scenic protection. Here, illumination and internally-lit signs are sharply limited, requiring a design review.
Gillette is a northeastern energy-sector city where sign permits run through the city’s planning/permitting office under the local zoning ordinance.
On Timelines
Timelines vary by jurisdiction. If you have a conforming on-premise sign, getting permission will take a short time (days to a couple of weeks). For additional design or historic review, or a special permit, in the case of off-premise billboards along interstate or federal-aid primary systems, add permission time.
Sources
How to Get a Sign Permit: Step by Step
Please check all the steps carefully with your local authorities, as they may vary from city to city. Most commonly, you’re required to:
- Check your zoning district and sign code: For instance, you can research your city’s planning or zoning department website. There, you’ll most probably find detailed information regarding the types of signs, size restrictions, and any zoning laws.
- Confirm whether your sign is exempt from permitting or requires one: While regulations vary by location, real estate signs advertising a property for sale or lease, temporary political or campaign signs, construction site signs identifying builders or architects during active work, window signs that cover less than a certain percentage (often 25%) of the window area, address numbers and nameplates required for emergency services, or directional signs that don’t contain advertising are often exempt, but exemptions are defined by each local ordinance, so always verify yours. Signs that usually require a sign permit include freestanding and building-mounted signs, illuminated signs that require electrical wiring, digital or electronic message centers, and large banners.
- Get property owner/landlord written consent if you don't own the building: Written consent is needed to grant you legal authorization to alter or attach signs to the property.
- Prepare your sign drawings and site plan: The sign drawings typically include the overall height, width, and depth of the signs. Include the exact names of the sign materials, such as aluminum signs or acrylic signs. You’ll also need to show how the sign fastens to the wall or its structural foundation if the sign sits on the ground. If illuminated, the sign’s electrical specifications, wiring paths, and power-disconnect designs should be included. Provide a full-color visual of what the finished sign will look like on the building. In the site plan, you may be required to include property lines showing all the boundaries and dimensions of the sign, a building footprint marking the exact location, and the sign location, with exact measurements of the distance from the sign to the property lines.
- Submit the application: It can be completed either in person or via electronic portals. But the available methods entirely depend on your local municipal government.
- Pay the permit fee: The fee heavily depends on your location and the sign’s complexity. Please check this with your local city or county municipal offices.
- Wait for plan review: The standard sign review usually takes two to six weeks, depending on your municipality’s workload and whether your sign requires additional reviews (for example, if it’s in a historic or special area). If any red lines or correction notices are issued by the city reviewer, you’ll have to update drawings, resubmit the documents, and pay additional fees, if required by jurisdiction.
- Install the sign once it's approved: This is the final step in the regulatory process.
- Schedule and pass final inspection: Once your sign is up, you should request the inspection through your local municipality's online portal or automated phone system.
Documents You'll Typically Need
Required documents differ by jurisdiction, and the office issuing your permit sets the list. Check with them directly before you assemble anything. Most packages include some of the following:
- A completed application form: an official document required by local municipal or city planning departments. This document is requested to approve the installation, alteration, or replacement of your sign.
- Property owner authorization: A written and signed letter or agent authorization from the landlord or property manager/owner that permits the installation of the sign.
- Site plans: You also need to include scaled drawings showing the property lines, building facade, existing signage (if any), and the proposed location of the new sign.
- Sign renderings and drawings: These documents must include detailed blueprints, color elevation drawings, dimensions, and material specifications.
- Engineering and electrical specifications: If your sign is large, heavy, or freestanding, you’ll be required to obtain a certified stamp from a licensed structural engineer. For illuminated signs, you’ll need to also include electrical permits.
How Long Does It Take to Get a Sign Permit
The timelines vary from jurisdiction to jurisdiction. As a general rule of thumb, straightforward sign permits are often issued within roughly 10 to 30 days, though there is no universal standard. Timelines can stretch for signs needing extra permits and reviews in addition to standard permits.
What Happens If You Install a Sign Without a Permit
Installing a sign without a permit can lead to heavy municipal fines, forced removal of the display, and costly delays for your business if your sign isn’t exempt. The fine amount heavily depends on the local municipality, the size and placement of the sign, and whether it’s a first-time or repeat offense. Commonly cited penalties range from around $100 for minor first-time violations to well over $10,000 in large cities or for repeat offenses, and many ordinances treat each day the sign remains up as a separate violation.
The regulations, fees, and timelines described in this guide are correct and verified as of the date of publishing and are provided for general reference only. They are not legal advice. We are not responsible for any amendments to state statutes, laws, or regulations that take place after the date of publishing. Before designing, purchasing, or installing any sign, verify current requirements directly with your city or county permitting office, the relevant state department of transportation, and, where appropriate, a licensed attorney.
You Might Also Be Interested In